Georgios K. Koulinas · Study
Home
/
Author
Georgios K. Koulinas
11 works
· latest 2022
· 1 institutions
cluster: provisional
ORCID 0000-0002-0323-6954
Follow
Suggest an ORCID correction
h-index
11
i10
11
Citations
712
Works here
11
10
11
13
14
19
20
21
22
Most cited in this library
A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem
2014 · 181 citations
The integration of HAZOP study with risk-matrix and the analytical-hierarchy process for identifying critical control-points and prioritizing risks in industry – A case study
2019 · 71 citations
An expanded HAZOP-study with fuzzy-AHP (XPA-HAZOP technique): Application in a sour crude-oil processing plant
2020 · 70 citations
A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities
2013 · 68 citations
Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
2020 · 62 citations
Works
11 shown
Machine learning integrated design and operation management for resilient circular manufacturing systems
Computers & Industrial Engineering
·
2022
·
4 authors
41
citations
Safety-assessment by hybridizing the MCDM/AHP & HAZOP-DMRA techniques through safety’s level colored maps: Implementation in a petrochemical industry
Alexandria Engineering Journal
·
2021
·
4 authors
·
Open access
34
citations
Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
Buildings
·
2020
·
4 authors
·
Open access
62
citations
A HAZOP with MCDM Based Risk-Assessment Approach: Focusing on the Deviations with Economic/Health/Environmental Impacts in a Process Industry
Sustainability
·
2020
·
4 authors
·
Open access
48
citations
An expanded HAZOP-study with fuzzy-AHP (XPA-HAZOP technique): Application in a sour crude-oil processing plant
Safety Science
·
2020
·
4 authors
70
citations
The integration of HAZOP study with risk-matrix and the analytical-hierarchy process for identifying critical control-points and prioritizing risks in industry – A case study
Journal of Loss Prevention in the Process Industries
·
2019
·
4 authors
71
citations
Risk Assessment Using Fuzzy TOPSIS and PRAT for Sustainable Engineering Projects
Sustainability
·
2019
·
5 authors
·
Open access
50
citations
A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem
Information Sciences
·
2014
·
3 authors
181
citations
A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities
Automation in Construction
·
2013
·
2 authors
68
citations
Construction Resource Allocation and Leveling Using a Threshold Accepting–Based Hyperheuristic Algorithm
Journal of Construction Engineering and Management
·
2011
·
2 authors
44
citations
A simulated annealing hyperheuristic for construction resource levelling
Construction Management and Economics
·
2010
·
2 authors
43
citations