S
Zodix
Study
Academic Library
Search
Dashboard
Shelves
Open access
My library
Inbox
Notes
Write
Learn
Alerts
More
Ask your library
Notifications
Quick cite
Review
Search or jump to…
⌘K
Yuan-Shyi Peter Chiu · Study
Home
/
Author
Yuan-Shyi Peter Chiu
21 works
· latest 2017
· 1 institutions
cluster: provisional
Follow
Claim this profile
h-index
18
i10
21
Citations
1,085
Works here
21
03
04
06
08
09
10
11
12
15
17
Most cited in this library
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
2003 · 222 citations
A note on “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns”
2009 · 121 citations
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
2006 · 109 citations
Optimal production lot sizing with rework, scrap rate, and service level constraint
2006 · 79 citations
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
2009 · 78 citations
Works
21 shown
Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system
International Journal of Industrial Engineering Computations
·
2017
·
4 authors
·
Open access
20
citations
A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery
Journal of Applied Research and Technology
·
2015
·
4 authors
·
Open access
22
citations
Intra-supply chain system with multiple sales locations and quality assurance
Expert Systems with Applications
·
2012
·
4 authors
18
citations
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
Applied Mathematics Letters
·
2012
·
4 authors
·
Open access
22
citations
Combining an alternative multi-delivery policy into economic production lot size problem with partial rework
Expert Systems with Applications
·
2011
·
3 authors
43
citations
Replenishment run time problem with machine breakdown and failure in rework
Expert Systems with Applications
·
2011
·
3 authors
45
citations
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
Mathematical and Computer Modelling
·
2011
·
4 authors
·
Open access
52
citations
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown
Computers & Industrial Engineering
·
2011
·
3 authors
25
citations
Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
Mathematical and Computer Modelling of Dynamical Systems
·
2010
·
4 authors
19
citations
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
Computers & Mathematics with Applications
·
2009
·
4 authors
·
Open access
78
citations
Incorporating multi-delivery policy and quality assurance into economic production lot size problem
Journal of Scientific & Industrial Research
·
2009
·
4 authors
·
Open access
36
citations
A note on “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns”
European Journal of Operational Research
·
2009
·
2 authors
121
citations
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
Computers & Mathematics with Applications
·
2008
·
3 authors
·
Open access
35
citations
Optimal production lot sizing with rework, scrap rate, and service level constraint
Mathematical and Computer Modelling
·
2006
·
3 authors
·
Open access
79
citations
Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives
Proceedings of the Institution of Mechanical Engineers Part B Journal of Engineering Manufacture
·
2006
·
3 authors
29
citations
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
European Journal of Operational Research
·
2006
·
2 authors
109
citations
Mathematical modeling for production system with backlogging and failure in repair
Journal of Scientific & Industrial Research
·
2006
·
2 authors
·
Open access
57
citations
Solving an EPQ Model with Rework and Service Level Constraint
Mathematical and Computational Applications
·
2006
·
3 authors
·
Open access
18
citations
The effect of service level constraint on EPQ model with random defective rate
Mathematical Problems in Engineering
·
2006
·
1 author
·
Open access
21
citations
Incorporating expedited time and cost of the end product into the product structure diagram
International Journal of Machine Tools and Manufacture
·
2004
·
2 authors
14
citations
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
Engineering Optimization
·
2003
·
1 author
222
citations