Decision Table Development and Application to the Construction of Fault Trees
6 references·2 citing·20 second hop
Decision Table Development and Application to the Construction of Fault Trees (1979)Decision Table Development and Applicatio…Nuclear Systems Reliability Engineering and Risk Assessment (1978)Nuclear Systems Reliability E…A new methodology for the computer-aided construction of fault trees (1977)A new methodology for the com…A Formal Methodology for Fault Tree Construction (1973)A Formal Methodology for Faul…Decision Tables Theory and Practice (1971)Decision Tables Theory and Pr…PREP AND KITT: COMPUTER CODES FOR THE AUTOMATIC EVALUATION OF A FAULT TREE. (1970)PREP AND KITT: COMPUTER CODES…A time-dependent methodology for fault tree evaluation (1970)A time-dependent methodology …Identification of system failure causes using bond graph models (2002)Identification of system fail…The Cat Methodology for Fault Tree Construction (1980)The Cat Methodology for Fault…Fault tree synthesis for chemical processes (1974)Dynamic Logical Analytical Methodology Versus Fault Tree: The Case Study of the Auxiliary Feedwater System of a Nuclear Power Plant (1986)HAZID, A Computer Aid for Hazard Identification (1999)Automated HAZOP revisited (2017)Computer-aided Synthesis of Fault-trees (1977)System dynamics: A unified approach (1977)Fault Tree Analysis, Methods, and Applications ߝ A Review (1985)Automatic Fault-Tree Generation as a Support for Safety Studies of Railway Interlocking Systems (2000)Bayesian Methods in Risk Assessment (1981)Models of Mental Strategies in Process Plant Diagnosis (1981)The foundations of models of dependence in probabilistic safety assessment (1987)Introduction to SASE : (1987)Design for safety of engineering systems with multiple failure state variables (1995)The propagation of faults in process plants: 1. Modelling of fault propagation (1986)Event-tree analysis using binary decision diagrams (2000)A fault tree analysis strategy using binary decision diagrams (2002)Fault Tree Analysis (2008)Fault TreesߞA State of the Art Discussion (1974)FATRAM-A Core Efficient Cut-Set Algorithm (1978)Top-down Algorithm for Obtaining Prime Implicant Sets of Non-Coherent Fault Trees (1978)
this work references cited by second hop

References

  • 1970A time-dependent methodology for fault tree evaluation285 cited
  • 1978Nuclear Systems Reliability Engineering and Risk Assessment113 cited
  • 1971Decision Tables Theory and Practice90 cited
  • 1970PREP AND KITT: COMPUTER CODES FOR THE AUTOMATIC EVALUATION OF A FAULT TREE.78 cited
  • 1973A Formal Methodology for Fault Tree Construction59 cited
  • 1977A new methodology for the computer-aided construction of fault trees53 cited

Cited by

  • 2002Identification of system failure causes using bond graph models16 cited
  • 1980The Cat Methodology for Fault Tree Construction12 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work