SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
PLANNING AND SCHEDULING THE REPAIR SHOPS OF THE DEUTSCHE LUFTHANSA AG: A HIERARCHICAL APPROACH
3 references·3 citing·27 second hop
PLANNING AND SCHEDULING THE REPAIR SHOPS OF THE DEUTSCHE LUFTHANSA AG: A HIERARCHICAL APPROACH (1992)PLANNING AND SCHEDULING THE REPAIR SHOPS …Lot Sizes, Lead Times and In-Process Inventories (1987)Lot Sizes, Lead Times and In-…Effect of service-levels on order-points or order-levels in inventory models (1981)Effect of service-levels on o…Some approximations in multi‐item, multi‐echelon inventory systems for recoverable items (1978)Some approximations in multi‐…Exact Analysis of Capacitated Two-Echelon Inventory Systems with Priorities (2014)Exact Analysis of Capacitated…DIAGNOSING ORDER PLANNING PERFORMANCE AT A NAVY MAINTENANCE AND REPAIR ORGANIZATION, USING LOGISTIC REGRESSION (2003)DIAGNOSING ORDER PLANNING PER…OR Practice: survey results and reflections of practising INFORMS members (1999)OR Practice: survey results a…Optimal Policies for a Multi-Echelon Inventory Problem (1960)Metric: A Multi-Echelon Technique for Recoverable Item Control (1968)Optimal Policies for a Multi-Echelon Inventory Problem (2004)The (S − 1, S) Inventory Policy Under Compound Poisson Demand (1966)An approximation to the stationary distribution of a multiechelon repairable-item inventory system with finite sources and repair channels (1989)Steady-state approximations for a multi-echelon multi-indentured repairable-item inventory system (1992)Optimal algorithm to determine the spare inventory level for a repairable-item inventory system (1996)The Future of Operational Research is Past (1979)The Natural Drift: What Happened to Operations Research? (1993)Insights on Modeling from a Dozen Experts (1994)On the nature of OR: taking stock (2002)In defence of Soft OR: Reflections on teaching Soft OR (2019)Statistical Methods for Quality Improvement (1990)Self-regulation through goal setting (1991)THE IMPACT OF ENTERPRISE INFORMATION TECHNOLOGY ADOPTION ON OPERATIONAL PERFORMANCE: AN EMPIRICAL INVESTIGATION (2002)Analysis of Inventory Systems. (1964)Smoothing, Forecasting and Prediction of Discrete Time Series. (1964)Decision Rules for Inventory Management (1968)Inventory models with minimal service level constraints (2001)Building up Resilience in a Pharmaceutical Supply Chain through Inventory, Dual Sourcing and Agility Capacity (2017)Inventory – forecasting: Mind the gap (2021)Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system (1977)CONWIP: a pull alternative to kanban (1990)Production Lot Sizing with Machine Breakdowns (1992)Dynamic Version of the Economic Lot Size Model (2004)Jobshop-Like Queueing Systems (2004)Effective supply chain management (2020)
this work references cited by second hop

References

  • 1987Lot Sizes, Lead Times and In-Process Inventories456 cited
  • 1981Effect of service-levels on order-points or order-levels in inventory models120 cited
  • 1978Some approximations in multi‐item, multi‐echelon inventory systems for recoverable items38 cited

Cited by

  • 1999OR Practice: survey results and reflections of practising INFORMS members34 cited
  • 2003DIAGNOSING ORDER PLANNING PERFORMANCE AT A NAVY MAINTENANCE AND REPAIR ORGANIZATION, USING LOGISTIC REGRESSION27 cited
  • 2014Exact Analysis of Capacitated Two-Echelon Inventory Systems with Priorities12 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work