SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Measuring Time: Improving Project Performance Using Earned Value Management
0 references·16 citing·37 second hopsampled
Measuring Time: Improving Project Performance Using Earned Value Management (2009)Measuring Time: Improving Project Perform…Estimation at Completion in Civil Engineering Projects: Review of Regression and Soft Computing Models (2021)Estimation at Completion in C…Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects (2019)Earned Schedule min-max: Two …Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities (2018)Using real project schedule d…A tool to test and validate algorithms for the resource-constrained project scheduling problem (2018)A tool to test and validate a…A buffer control method for top-down project control (2017)A buffer control method for t…Practical Application and Empirical Evaluation of Reference Class Forecasting for Project Management (2016)Practical Application and Emp…Extensions of earned value management: Using the earned incentive metric to improve signal quality (2016)Extensions of earned value ma…A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence (2016)A Nearest Neighbour extension…Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management (2015)Evaluation of deterministic s…Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost (2015)Empirical Evaluation of Earne…Developing a framework for statistical process control approaches in project management (2015)Developing a framework for st…A multivariate approach for top-down project control using earned value management (2015)A multivariate approach for t…A comparative study of Artificial Intelligence methods for project duration forecasting (2015)A comparative study of Artifi…Setting tolerance limits for statistical project control using earned value management (2014)Setting tolerance limits for …A comparison of the performance of various project control methods using earned value management systems (2014)A comparison of the performan…Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control (2012)Project Management with Dynam…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)A guide to the project management body of knowledge (PMBOK guide) (2004)Explainable machine learning for project management control (2023)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Activity networks: Project planning and control by network models (1977)A Decision-Theoretic Generalization of On-Line Learning and an Application to Boosting (1997)The Rise of Artificial Intelligence in Project Management: A Systematic Literature Review of Current Opportunities, Enablers, and Barriers (2025)Earned value in project management (2003)Earned Value Project Management Method and Extensions (2003)Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran (2020)Proceedings of the 2006 Winter Simulation Conference (2006)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques (2016)Economic Control of Quality of Manufactured Product. (1932)CONTINUOUS INSPECTION SCHEMES (1954)Application of a Technique for Research and Development Program Evaluation (1959)Multivariate SPC Charts for Monitoring Batch Processes (1995)Conditions of success for earned value analysis in projects (2017)Multiple Linear Regression Model for Improved Project Cost Forecasting (2022)Using activity sensitivity and network topology information to monitor project time performance (2009)On the dynamic use of project performance and schedule risk information during projecttracking (2010)Project Management with Dynamic Scheduling (2012)Optimised scheduling for weather sensitive offshore construction projects (2016)Going to the core of hard resource-constrained project scheduling instances (2020)Bankruptcy prediction in banks and firms via statistical and intelligent techniques – A review (2006)A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP) (2018)GDP Forecasting: Machine Learning, Linear or Autoregression? (2021)Leveraging Artificial Intelligence in Project Management: A Systematic Review of Applications, Challenges, and Future Directions (2025)Prospect Theory: An Analysis of Decision under Risk (1979)A Guide to the project management body of knowledge (1996)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Regression to the tail: Why the Olympics blow up (2020)Homo Heuristicus: From Risk Management to Managing Uncertainty in Large-Scale Infrastructure Projects (2022)Governing Large Projects: A Three-Stage Process to Get It Right (2023)Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)A machine learning study to improve the reliability of project cost estimates (2023)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

No references inside the corpus for this window.

Cited by

  • 2015Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management90 cited
  • 2015A comparative study of Artificial Intelligence methods for project duration forecasting87 cited
  • 2014Setting tolerance limits for statistical project control using earned value management84 cited
  • 2015Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost76 cited
  • 2018Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities72 cited
  • 2014A comparison of the performance of various project control methods using earned value management systems65 cited
  • 2016A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence61 cited
  • 2012Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control58 cited
  • 2016Practical Application and Empirical Evaluation of Reference Class Forecasting for Project Management58 cited
  • 2015A multivariate approach for top-down project control using earned value management57 cited
  • 2018A tool to test and validate algorithms for the resource-constrained project scheduling problem55 cited
  • 2017A buffer control method for top-down project control51 cited
  • 2019Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

47 cited
  • 2016Extensions of earned value management: Using the earned incentive metric to improve signal quality44 cited
  • 2015Developing a framework for statistical process control approaches in project management42 cited
  • 2021Estimation at Completion in Civil Engineering Projects: Review of Regression and Soft Computing Models39 cited