Construction Planning—Beyond the Critical Path
0 references·16 citing·41 second hop
Construction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond the Critical…Repetitive Scheduling Method: Requirements, Modeling, and Implementation (2016)Repetitive Scheduling Method:…Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)Time/cost optimization using …Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Multiobjective Linear Program…Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling (2004)Critical path determination b…Optimum Planning of Highway Construction under A + B Bidding Method (2001)Optimum Planning of Highway C…Importance of Capacity Constraints to Construction Cost and Schedule (2000)Importance of Capacity Constr…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Planning and control processes and techniques for refurbishment management (1998)Planning and control processe…Linear scheduling: past research efforts and future directions (1998)Linear scheduling: past resea…CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)CPM/LOB: New Methodology to I…Planning repetitive construction: Current practice (1993)Planning repetitive construct…New Generation of Planning Structures (1993)New Generation of Planning St…Siren: A Repetitive Construction Simulation Model (1985)Siren: A Repetitive Construct…Criticism of CPM for Project Planning Analysis (1984)Criticism of CPM for Project …Construction Planning for Linear Projects (1980)Line‐of‐Balance Scheduling in Pavement Construction (1986)Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Modern Construction Management (2012)Linear Scheduling Method for Highway Construction (1981)RPM: Repetitive Project Modeling (1990)Letter to the Editor—Monte Carlo Methods and the PERT Problem (1963)Simulation using GPSS (1974)Probability Concepts in Engineering Planning and Design (1975)Modeling Operational Activities in Object‐Oriented Simulation (1993)Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes (2004)Empirical Research on the Success of Production Control in Building Construction Projects (2009)The discrete time-cost tradeoff problem revisited (1995)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Heuristic method for multi‐project finance‐based scheduling (2009)Generic Scheduling Optimization Model for Multiple Construction Projects (2017)Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)Time Space Scheduling Method (1982)Construction Decision Support System for Delay Analysis (1993)Delay Analysis within Construction Contracting Organizations (2008)Stakeholder Management in International Projects (2010)Professional Construction Management (1976)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling Projects with Repeating Activities (1998)Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey (2014)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)A hybrid algorithm for the university course timetabling problem using the improved parallel genetic algorithm and local search (2020)Scheduling project networks with resource constraints and time windows (1988)Automated trade‐off between time and cost in planning repetitive construction projects (2009)Optimised scheduling for weather sensitive offshore construction projects (2016)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Construction Resource Scheduling with Genetic Algorithms (1996)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)Space-Time Repetitive Project Scheduling Considering Location and Congestion (2018)A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)Enhanced Repetitive-Scheduling Computation and Visualization (2020)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2008Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling118 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 1993New Generation of Planning Structures113 cited
  • 1994CPM/LOB: New Methodology to Integrate CPM and Line of Balance112 cited
  • 2007Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects108 cited
  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 1984Criticism of CPM for Project Planning Analysis90 cited
  • 1985Siren: A Repetitive Construction Simulation Model66 cited
  • 2016Repetitive Scheduling Method: Requirements, Modeling, and Implementation52 cited
  • 2004Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling51 cited
  • 2001Optimum Planning of Highway Construction under A + B Bidding Method51 cited
  • 2000Importance of Capacity Constraints to Construction Cost and Schedule49 cited
  • 1998Planning and control processes and techniques for refurbishment management44 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 1998Linear scheduling: past research efforts and future directions42 cited
  • 1993Planning repetitive construction: Current practice41 cited