The discrete time-cost tradeoff problem revisitedPrabuddha De, Edward Dunne, Jay B. Ghosh, Charles E. Wells1995-03-01articleEuropean Journal of Operational Research229 citationsclosedNo readable copy stored yet — this record is metadata only.Resource-Constrained Project SchedulingComplexity and Algorithms in GraphsOptimization and Mathematical ProgrammingAbstractNo abstract was published for this record.Citations in this libraryStored only when both papers are in the corpus — 229 citations exist upstream.References1961Critical-Path Planning and Scheduling: Mathematical Basis1977Activity networks: Project planning and control by network models1983Project Management With Cpm, Pert and Precedence Diagramming1961A Network Flow Computation for Project Cost Curves1991Time-based competition: the next battleground in American manufacturingCited by1997Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks1999A Classification Scheme for Project Scheduling2010Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction2012A hybrid genetic algorithm for the discrete time–cost trade-off problem2000Stochastic Construction Time-Cost Trade-Off Analysis1996Optimal procedures for the discrete time/cost trade-off problem in project networks2018Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution2008Optimizing Construction Time and Cost Using Ant Colony Optimization Approach