A hybrid genetic algorithm for the discrete time–cost trade-off problemRifat Sönmez, Önder Halis Bettemir2012-04-10articleExpert Systems with Applications168 citationsgreenNo readable copy stored yet — this record is metadata only.Resource-Constrained Project SchedulingMetaheuristic Optimization Algorithms ResearchScheduling and Optimization AlgorithmsAbstractNo abstract was published for this record.Citations in this libraryStored only when both papers are in the corpus — 168 citations exist upstream.References2005Experimental investigation of heuristics for resource-constrained project scheduling: An update1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems2005Time-Cost-Quality Trade-Off Analysis for Highway Construction1999Optimization of construction time-cost trade-off analysis using genetic algorithms1995The discrete time-cost tradeoff problem revisited1997Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks1997Using Improved Genetic Algorithms to Facilitate Time-Cost OptimizationCited by2013A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems2013A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project2016Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem2018Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization2023Extensions of the resource-constrained project scheduling problem2014Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling2017Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems2020Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling