SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Linear Scheduling Method for Highway Construction
0 references·16 citing·29 second hop
Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for Highway Cons…Optimizing linear project scheduling with multi-skilled crews (2012)Optimizing linear project sch…A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)Time/cost optimization using …Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Multiobjective Linear Program…Evolutionary resource scheduler for linear projects (2007)Evolutionary resource schedul…Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)Optimal Repetitive Scheduling…Effect of learning on line-of-balance scheduling (2001)Effect of learning on line-of…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Resource Leveling of Linear S…Scheduling of Repetitive Projects with Cost Optimization (1993)Scheduling of Repetitive Proj…New Generation of Planning Structures (1993)New Generation of Planning St…Extensions to Linear Scheduling Optimization (1988)Extensions to Linear Scheduli…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Application of Linear Scheduling (1986)Application of Linear Schedul…Criticism of CPM for Project Planning Analysis (1984)Criticism of CPM for Project …Factors Affecting the Cost of Airplanes (1936)THE EFFECTS OF INCREASING SKILL ON CYCLE TIME AND ITS CONSEQUENCES FOR TIME STANDARDS (1957)THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY (1979)Formalisation and use of competencies for industrial performance optimisation: A survey (2006)Project Control: Literature Review (2006)Critical Investigation into the Applicability of the Learning Curve Theory to Rebar Fixing Labor Productivity (2010)Construction Planning for Linear Projects (1980)RPM: Repetitive Project Modeling (1990)CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling Projects with Repeating Activities (1998)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)GA optimization model for repetitive projects with soft logic (2011)Metaheuristics for project and construction management – A state-of-the-art review (2011)Modern Construction Management (2012)Project Management With Cpm, Pert and Precedence Diagramming (1983)Planning and analysis of construction operations (1992)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Professional Construction Management (1976)Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey (2014)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)A hybrid algorithm for the university course timetabling problem using the improved parallel genetic algorithm and local search (2020)Construction Resource Scheduling with Genetic Algorithms (1996)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)Project Management with Dynamic Scheduling (2012)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 1986Application of Linear Scheduling128 cited
  • 1998Resource Leveling of Linear Schedules Using Integer Linear Programming120 cited
  • 2008Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling118 cited
  • 2001Effect of learning on line-of-balance scheduling114 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 1993New Generation of Planning Structures113 cited
  • 1993Scheduling of Repetitive Projects with Cost Optimization112 cited
  • 2007Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects108 cited
  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 2012Optimizing linear project scheduling with multi-skilled crews103 cited
  • 1988Extensions to Linear Scheduling Optimization101 cited
  • 2007Evolutionary resource scheduler for linear projects91 cited
  • 1984Criticism of CPM for Project Planning Analysis

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

90 cited
  • 2001Optimal Repetitive Scheduling Model with Shareable Resource Constraint86 cited