SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Production: Planning, Control and Integration
0 references·16 citing·55 second hop
Production: Planning, Control and Integration (1997)Production: Planning, Control and Integra…Production planning and control for remanufacturing: exploring characteristics and difficulties with case studies (2015)Production planning and contr…Production planning and control for remanufacturing: literature review and analysis (2011)Production planning and contr…Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint (2011)Optimal MRP parameters for a …Optimal time phasing and periodicity for MRP with POQ policy (2010)Optimal time phasing and peri…Optimal order size to take advantage of a one-time discount offer with allowed backorders (2009)Optimal order size to take ad…Measuring the efficacy of inventory with a dynamic input–output model (2009)Measuring the efficacy of inv…A hybrid push/pull system in assemble-to-order manufacturing environment (2008)A hybrid push/pull system in …Two-stage workforce planning under demand fluctuations and uncertainty (2007)Two-stage workforce planning …A Web-based Kanban system for job dispatching, tracking, and performance monitoring (2007)A Web-based Kanban system for…Project Control: Literature Review (2006)Project Control: Literature R…The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty (2004)The impact of component commo…MPCS: Multidimensional Project Control System (2003)MPCS: Multidimensional Projec…Comparative modelling of multi-stage production-inventory control policies with lot sizing (2003)Comparative modelling of mult…DELIVERY GUARANTEES AND THE INTERDEPENDENCE OF MARKETING AND OPERATIONS (2002)DELIVERY GUARANTEES AND THE I…Applying an Enterprise Engineering Approach to Engineering Work: A Focus on Business Process Modeling (2002)Applying an Enterprise Engine…Bottom-Up Vs. Top-Down Approaches to Supply Chain Modeling (1999)Bottom-Up Vs. Top-Down Approa…Quantitative Input and Output Relations in the Economic Systems of the United States (1936)Managing Disruption Risks in Supply Chains (2005)Input-output analysis foundations and extensions (2009)Modeling the Role of Inventories and Heterogeneity in the Assessment of the Economic Costs of Natural Disasters (2013)Economic resilience of the firm: A production theory approach (2018)On input-output economic models in disaster impact assessment (2018)The Theory of Inventory Management (1958)Inventory management and production planning and scheduling (1999)Retailer's pricing, credit and inventory policies for deteriorating items in response to temporary price/credit incentives (2002)A distribution-free newsvendor problem with nonlinear holding cost (2013)Three stage trade credit policy in a three-layer supply chain–a production-inventory model (2013)EPQ models for items with imperfect quality and one-time-only discount (2014)Introduction to Stochastic Programming (1998)Stochastic Programming (2010)Introduction to Stochastic Programming (2011)On the Design of Sparse but Efficient Structures in Operations (2017)A Systematic Literature Review for Personnel Scheduling Problems (2020)Strategic Workforce Planning Under Uncertainty (2021)Critical factors in successful project implementation (1987)Project management handbook (1987)Project management — A managerial approach (1989)Data envelopment analysis: theory and applications (2009)International Journal of Production Research (1962)Factory Physics : Foundations of Manufacturing Management (1995)Price, delivery time guarantees and capacity selection (1998)Manufacturing lead-time rules: Customer retention versus tardiness costs (2004)Reducing Welding Defects in Turnaround Projects: A Lean Six Sigma Case Study (2014)Inventory competition in a dual-channel supply chain with delivery lead time consideration (2016)Issues in environmentally conscious manufacturing and product recovery: a survey (1999)Production planning and control for remanufacturing: industry practice and research needs (2000)Research Methods and Organization Studies (2003)Bricks vs. clicks: Which is better for marketing remanufactured products? (2014)Effects of carbon emission regulations on remanufacturing decisions with limited information of demand distribution (2014)Dynamic Capabilities to Achieve Corporate Sustainability: A Roadmap to Sustained Competitive Advantage (2022)MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY (1976)Pricing and the Newsvendor Problem: A Review with Extensions (1999)Models for production planning under uncertainty: A review (2006)Simulation-based optimization methods for setting production planning parameters (2013)A genetic algorithm approach for multi-product multi-period continuous review inventory models (2014)Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation (2020)Aggregate Safety Stock Levels and Component Part Commonality (1982)The Effect of Commonality on Safety Stock in a Simple Inventory Model (1986)Component Commonality with Service Level Requirements (1988)The cost of using stationary inventory policies when demand is non-stationary (2010)A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty (2013)Managing uncertainty through supply chain flexibility: reactive vs. proactive approaches (2014)Production and Operations Analysis (1992)Token-based pull production control systems: an introductory overview (2011)Balancing Push and Pull Strategies within the Production System (2016)Impact of the Planning from the Kanban System on the Company’s Operating Benefits (2018)The Logical Framework Method for Defining Project Success (1999)A guide to the project management body of knowledge (PMBOK guide) (2004)Critical factors influencing the project success amongst manufacturing companies in Malaysia (2009)Improved Critical Chain Project Management Framework for Scheduling Construction Projects (2014)Setting tolerance limits for statistical project control using earned value management (2014)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2011Production planning and control for remanufacturing: literature review and analysis165 cited
  • 2009Measuring the efficacy of inventory with a dynamic input–output model147 cited
  • 2006Project Control: Literature Review98 cited
  • 2002DELIVERY GUARANTEES AND THE INTERDEPENDENCE OF MARKETING AND OPERATIONS73 cited
  • 2007Two-stage workforce planning under demand fluctuations and uncertainty62 cited
  • 2009Optimal order size to take advantage of a one-time discount offer with allowed backorders59 cited
  • 2011Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint54 cited
  • 2004The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty53 cited
  • 2008A hybrid push/pull system in assemble-to-order manufacturing environment46 cited
  • 2003MPCS: Multidimensional Project Control System46 cited
  • 2015Production planning and control for remanufacturing: exploring characteristics and difficulties with case studies42 cited
  • 1999Bottom-Up Vs. Top-Down Approaches to Supply Chain Modeling41 cited
  • 2007A Web-based Kanban system for job dispatching, tracking, and performance monitoring38 cited
  • 2003

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Comparative modelling of multi-stage production-inventory control policies with lot sizing
33 cited
  • 2010Optimal time phasing and periodicity for MRP with POQ policy30 cited
  • 2002Applying an Enterprise Engineering Approach to Engineering Work: A Focus on Business Process Modeling23 cited