SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Reduction of Machine Setup Time
3 references·2 citing·17 second hop
Reduction of Machine Setup Time (2010)Reduction of Machine Setup TimeA Revolution in Manufacturing: The SMED System (2019)A Revolution in Manufacturing…Team Roles at Work (2012)Team Roles at WorkRules for integrating fast changeover capabilities into new equipment design (2002)Rules for integrating fast ch…Portfolio analysis of a Lean Six Sigma production process (2019)Portfolio analysis of a Lean …Optimization of a Product Batch Quantity (2014)Optimization of a Product Bat…Toyota Production System (1993)Toyota Production System: An Integrated Approach to Just-In-Time (1993)Changeover Improvement: Reinterpreting Shingo's “SMED” Methodology (2007)A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques (2013)Improving Changeover Time: A Tailored SMED Approach for Welding Cells (2013)Production and inventory management (1983)Manufacturing Planning and Control Systems. (1990)Manufacturing Planning and Control Systems (1996)Lean Thinking—Banish Waste and Create Wealth in your Corporation (1997)Lean Thinking—Banish Waste and Create Wealth in your Corporation (1997)Toyota production system: beyond large-scale production (1998)How leaders influence the impact of affective events on team climate and performance in R&D teams (2002)Creating and Sustaining Effective Professional Learning Communities (2005)A Review and Integration of Team Composition Models (2013)A conceptual framework for the analysis of vulnerability in supply chains (2000)Bridging Practice and Theory: A Design Science Approach (2009)Variations of the kanban system: Literature review and classification (2010)
this work references cited by second hop

References

  • 2019A Revolution in Manufacturing: The SMED System793 cited
  • 2012Team Roles at Work735 cited
  • 2002Rules for integrating fast changeover capabilities into new equipment design90 cited

Cited by

  • 2019Portfolio analysis of a Lean Six Sigma production process14 cited
  • 2014Optimization of a Product Batch Quantity13 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work