Planning and analysis of construction operations
0 references·16 citing·45 second hop
Planning and analysis of construction operations (1992)Planning and analysis of construction ope…Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms (2011)Time, Cost, and Environmental…Multi-objective simulation-optimization for earthmoving operations (2008)Multi-objective simulation-op…Simplified Discrete-Event Simulation Approach for Construction Simulation (2003)Simplified Discrete-Event Sim…Resource-Activity Critical-Path Method for Construction Planning (2003)Resource-Activity Critical-Pa…Enterprise Resource Planning for Construction Business Management (2003)Enterprise Resource Planning …Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Comparison of Linear Scheduli…Process Model for Administrating Construction Claims (2002)Process Model for Administrat…Simulation of Concrete Batch Plant Production (2001)Simulation of Concrete Batch …Simplified CPM/PERT Simulation Model (2000)Simplified CPM/PERT Simulatio…Activity-Based Construction (ABC) Modeling and Simulation Method (1999)Activity-Based Construction (…Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Resource Leveling of Linear S…Multiskilled Labor Utilization Strategies in Construction (1998)Multiskilled Labor Utilizatio…EZStrobe—general-purpose simulation system based on activity cycle diagrams (1998)EZStrobe—general-purpose simu…Resource-Based Modeling for Construction Simulation (1997)Resource-Based Modeling for C…General Purpose Simulation with Stroboscope (1994)General Purpose Simulation wi…Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)Estimating Construction Produ…The art of simulation (1964)Cyclone–Method for Modeling Job Site Processes (1977)Computer simulation in management science (1984)Probability of Project Completion Using Stochastic Project Scheduling Simulation (2005)Automated Statistical Analysis in Stochastic Project Scheduling Simulation (2006)Bond rating: a nonconservative application of neural networks (1988)Productivity improvement in construction (1988)A fuzzy neural network approach for contractor prequalification (2001)Construction equipment productivity estimation using artificial neural network model (2006)Estimation of earthworks execution time cost by means of artificial neural networks (2010)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource Leveling in Construction by Optimization (1989)Scheduling Projects with Repeating Activities (1998)Work Continuity Constraints in Project Scheduling (2005)Evolutionary resource scheduler for linear projects (2007)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Organizing to Increase Innovation in Construction Firms (1989)Redundant, Overlapping Organization: A Japanese Approach to Managing the Innovation Process (1990)ORGANIZATIONAL INTEGRATION AND PROCESS INNOVATION. (1992)Algorithm for Scheduling with Multiskilled Constrained Resources (2000)Fundamental Principles of Workforce Management (2005)Optimizing linear project scheduling with multi-skilled crews (2012)Simulation Modeling and Analysis. (1983)Knowledge-Based Simulation Modeling of Construction Fleet Operations Using Multimodal-Process Data Mining (2013)Construction Resource Scheduling with Genetic Algorithms (1996)New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem (2008)A review of methods and algorithms for optimizing construction scheduling (2013)Uncertainty (1990)A Guide to the project management body of knowledge (1996)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan (2013)A many-objective optimization model for construction scheduling (2019)Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach (2020)Project Management: Techniques in Planning and Controlling Construction Projects (1984)Tools for Thinking—Modelling in Management Science (1997)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Project scheduling for constructing biogas plant using critical path method (2017)HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong (2003)Simulation of Concrete Paving Operations on Interstate-74 (2007)Integrating Messy Genetic Algorithms and Simulation to Optimize Resource Utilization (2009)Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization (2008)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2003Simplified Discrete-Event Simulation Approach for Construction Simulation161 cited
  • 2003Resource-Activity Critical-Path Method for Construction Planning156 cited
  • 1994Estimating Construction Productivity: Neural‐Network‐Based Approach123 cited
  • 1998Resource Leveling of Linear Schedules Using Integer Linear Programming120 cited
  • 1999Activity-Based Construction (ABC) Modeling and Simulation Method109 cited
  • 1998Multiskilled Labor Utilization Strategies in Construction109 cited
  • 1994General Purpose Simulation with Stroboscope107 cited
  • 2001Simulation of Concrete Batch Plant Production105 cited
  • 2000Simplified CPM/PERT Simulation Model103 cited
  • 2011Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms96 cited
  • 1997Resource-Based Modeling for Construction Simulation93 cited
  • 2003Enterprise Resource Planning for Construction Business Management92 cited
  • 1998EZStrobe—general-purpose simulation system based on activity cycle diagrams88 cited
  • 2003Comparison of Linear Scheduling Model and Repetitive Scheduling Method83 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2002
Process Model for Administrating Construction Claims
82 cited
  • 2008Multi-objective simulation-optimization for earthmoving operations77 cited