SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Application of Cost-Flow Forecasting Models
0 references·6 citing·16 second hop
Application of Cost-Flow Forecasting Models (1982)Application of Cost-Flow Forecasting Mode…Assessment of the Disaster Recovery Progress through Mathematical Modelling (2019)Assessment of the Disaster Re…The S-curve envelope as a tool for monitoring and control of projects (2017)The S-curve envelope as a too…Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area (2012)Analyzing the Impact of Negat…Estimating Project S-Curves Using Polynomial Function and Neural Networks (2009)Estimating Project S-Curves U…A Model for Updating Project S-curve by Using Neural Networks and Matching Progress (2009)A Model for Updating Project …Financing Construction: Cash Flows and Cash Farming (2003)Financing Construction: Cash …Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Construction delay: a quantitative analysis (2000)Causes and effects of delays in Malaysian construction industry (2007)A construction project cash flow model—an idiographic approach (1986)An S-curve equation for project control (1989)Modelling standard cost commitment curves for contractors' cash flow forecasting (1993)Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)The use of artificial neural networks in construction management: a review (1996)A neural networks approach for cost flow forecasting (1998)Primary, Secondary, and Meta-Analysis of Research (1976)Handbook of Qualitative Research (1994)Cybernetics or Control and Communication in the Animal and the Machine (2019)Monitoring systems and their effectiveness for project cost control in construction (2002)Project cash flow analysis in the presence of uncertainty in activity duration and cost (2011)- Project Management Body of Knowledge (2013)Applying fuzzy techniques to cash flow analysis (1999)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2009Estimating Project S-Curves Using Polynomial Function and Neural Networks49 cited
  • 2003Financing Construction: Cash Flows and Cash Farming47 cited
  • 2009A Model for Updating Project S-curve by Using Neural Networks and Matching Progress40 cited
  • 2017The S-curve envelope as a tool for monitoring and control of projects38 cited
  • 2012Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area38 cited
  • 2019Assessment of the Disaster Recovery Progress through Mathematical Modelling6 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work