SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
THE PERFORMANCE OF BUSWAY TRANSIT IN DEVELOPING CITIES
1 references·10 citing·44 second hop
THE PERFORMANCE OF BUSWAY TRANSIT IN DEVELOPING CITIES (1991)THE PERFORMANCE OF BUSWAY TRANSIT IN DEVE…THE PERFORMANCE AND IMPACT OF RAIL MASS TRANSIT IN DEVELOPING COUNTRIES (1990)THE PERFORMANCE AND IMPACT OF…Capacity Estimation of On-Street, Mid-Block, Off-Line Bus Stops Considering Yield-to-Bus Rule (2019)Capacity Estimation of On-Str…Delay at Bus Stops of Transmilenio Transport System According to Parameters Measured” in situ”. Case Study Bogotá-Colombia (2014)Delay at Bus Stops of Transmi…Maximizing bus discharge flows from multi-berth stops by regulating exit maneuvers (2013)Maximizing bus discharge flow…Impacto de elementos de projeto no desempenho operacional de sistemas BRT de faixa única sem ultrapassagem (2013)Impacto de elementos de proje…Berth assignment planning for multi‐line bus stops (2013)Berth assignment planning for…Bus Dwell-Time Model of Main Urban Route Stops (2012)Bus Dwell-Time Model of Main …Value of the Facilities and Attributes of New Heavy Rail and Bus Rapid Transit Projects in a Developing City: The Case of Lima, Peru (2003)Value of the Facilities and A…BUS RAPID OR LIGHT RAIL TRANSIT FOR INTERMEDIATE CITIES (2002)BUS RAPID OR LIGHT RAIL TRANS…A REVIEW OF BUS PRIORITY SYSTEMS IN BRAZIL: FROM BUS LANES TO BUSWAY TRANSIT (2000)A REVIEW OF BUS PRIORITY SYST…Light rail or busway? A comparative evaluation for a corridor in Beijing (1996)Light rail or busway? A compa…Theory of Games and Economic Behavior (1945)Robust Optimization of Large-Scale Systems (1995)Tradable credits scheme and transit investment optimization for a two‐mode traffic network (2016)Performance Analysis of Overtaking Maneuvers at Bus Stops with Tandem Berths (2019)Theory of games and economic behavior (2019)Efficient heuristic methods for berth allocation at multi-line, multi-berth curbside bus stops (2023)The effects of network structure on reliability of transit service (1980)On the capacity of isolated, curbside bus stops (2011)Models of Bus Queueing at Curbside Stops (2014)Capacity approximations for near- and far-side bus stops in dedicated bus lanes (2019)Bus queue time estimation model for a curbside bus stop considering the blocking effect (2022)A critical review of analytical approaches in public bus transit network design and operations planning with focus on emerging technologies and sustainability (2024)ANALYZING TRANSIT TRAVEL TIME PERFORMANCE (1983)A Guidebook for Developing a Transit Performance-Measurement System (2003)Modeling Transit Trip Time Using Archived Bus Dispatch System Data (2003)LEEDS INTEGRATED LAND-USE TRANSPORT MODEL (LILT) (1983)Urban transit systems : guidelines for examining options (1986)Urban public transportation systems and technology (1987)Selecting rail grade crossing investments with a decision support system (2002)Analysis of flows and speeds of urban transit systems for consideration of modal transition in a corridor (2011)Selecting the public transit projects with PCA-DP technique: The example of Xiamen City (2015)On the capacity of bus transit systems (2002)Measuring Bus Stop Dwell Time and Time Lost Serving Stop with London iBus Automatic Vehicle Location Data (2013)Measuring the Determinants of Bus Dwell Time: New Insights and Potential Biases (2017)Estimating bus dwell time: A review of the literature (2022)Urban travel demand: A behavioral analysis (1976)Discrete choice analysis: Theory and application to travel demand (1988)Stated preference analysis of travel choices: the state of practice (1994)SURVEY DESIGN TO GRASP AND COMPARE USER'S ATTITUDES ON BUS RAPID TRANSIT (BRT) IN DEVELOPING COUNTRIES (2006)An approach for evaluating connectivity of interrupted rail networks with bus bridging services (2018)Critical evaluation of transit policies in Lima, Peru; resilience of rail rapid transit (Metro) in a developing country (2024)Transit capacity and quality of service manual (2003)Optimizing bus stop spacing in urban areas (2009)A simultaneous bus route design and frequency setting problem for Tin Shui Wai, Hong Kong (2010)Estimating Corridor Capacity of a Bus Rapid Transit System: Concept of Failure Rate Revisited (2020)Simulation-Based Sensitivity Analysis for Evaluating Factors Affecting Bus Service Reliability: A Big and Smart Data Implementation (2020)Spatiotemporal capacity estimation of bus rapid transit system based on dwell time analysis (2023)Choosing the wrong technology: Or how to spend billions and reduce transit use (1988)Issues In Bus Rapid Transit (1998)THIS IS LIGHT RAIL TRANSIT (2001)A Transit Technology Selection Model (2014)Inaccuracy of traffic forecasts and cost estimates on large transport projects (1997)Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases (2012)Cost overrun in the Malaysian construction industry projects: A deeper insight (2014)
this work references cited by second hop

References

  • 1990THE PERFORMANCE AND IMPACT OF RAIL MASS TRANSIT IN DEVELOPING COUNTRIES62 cited

Cited by

  • 2013Maximizing bus discharge flows from multi-berth stops by regulating exit maneuvers27 cited
  • 2012Bus Dwell-Time Model of Main Urban Route Stops27 cited
  • 2013Berth assignment planning for multi‐line bus stops26 cited
  • 2003Value of the Facilities and Attributes of New Heavy Rail and Bus Rapid Transit Projects in a Developing City: The Case of Lima, Peru15 cited
  • 2019Capacity Estimation of On-Street, Mid-Block, Off-Line Bus Stops Considering Yield-to-Bus Rule11 cited
  • 1996Light rail or busway? A comparative evaluation for a corridor in Beijing11 cited
  • 2002BUS RAPID OR LIGHT RAIL TRANSIT FOR INTERMEDIATE CITIES10 cited
  • 2014Delay at Bus Stops of Transmilenio Transport System According to Parameters Measured” in situ”. Case Study Bogotá-Colombia7 cited
  • 2000A REVIEW OF BUS PRIORITY SYSTEMS IN BRAZIL: FROM BUS LANES TO BUSWAY TRANSIT6 cited
  • 2013Impacto de elementos de projeto no desempenho operacional de sistemas BRT de faixa única sem ultrapassagem4 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work