SZodixStudyAcademic Library
DashboardShelvesOpen accessMy libraryInboxNotesWriteLearnAlerts
More
Ask your libraryNotificationsQuick citeReview
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Is Scheduling a Solved Problem?
8 references·0 citing·37 second hop
Is Scheduling a Solved Problem? (2005)Is Scheduling a Solved Problem?Planning and Scheduling (2016)Planning and SchedulingStability and resource allocation in project planning (2004)Stability and resource alloca…Generating robust schedules through temporal flexibility (2004)Generating robust schedules t…Recent research directions in automated timetabling (2002)Recent research directions in…A self‐adapting genetic algorithm for project scheduling under resource constraints (2002)A self‐adapting genetic algor…Auction Protocols for Decentralized Scheduling (2001)Auction Protocols for Decentr…Intelligent Scheduling Systems (1995)Intelligent Scheduling SystemsSchedule Optimization Using Genetic Algorithms (1991)Schedule Optimization Using G…Risk, Uncertainty and Profit (1921)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)The trade-off between stability and makespan in resource-constrained project scheduling (2005)A tabu search procedure for developing robust predictive project schedules (2007)An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations (2016)Scheduling project networks with resource constraints and time windows (1988)Benchmark Instances for Project Scheduling Problems (1999)A Constraint-Based Method for Project Scheduling with Time Windows (2002)Generating Robust Partial Order Schedules (2004)Robust execution strategies for project scheduling with unreliable resources and stochastic durations (2015)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)PSPLIB - A project scheduling problem library (1997)Justification and RCPSP: A technique that pays (2004)A hybrid genetic algorithm for the resource-constrained project scheduling problem (2007)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)A concept of compromise solutions and the method of the displaced ideal (1974)An introduction to timetabling (1985)A Survey of Automated Timetabling (1999)Case-based heuristic selection for timetabling problems (2006)A survey of metaheuristic-based techniques for University Timetabling problems (2007)A survey of search methodologies and automated system development for examination timetabling (2008)Multipart pricing of public goods (1971)Incentives in Teams (1973)Efficient mechanisms for bilateral trading (1983)Computationally feasible VCG mechanisms (2000)Solving Combinatorial Auctions Using Stochastic Local Search (2000)Towards a universal test suite for combinatorial auction algorithms (2000)Comparative modelling of multi-stage production-inventory control policies with lot sizing (2003)Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects (2012)The Influence of Financial Literacy, Saving Behaviour, and Financial Management on Retirement Confidence among Women Working in the Malaysian Public Sector (2014)Construction Resource Scheduling with Genetic Algorithms (1996)A genetic algorithm approach to a general category project scheduling problem (1999)Location allocation modeling for healthcare facility planning in Malaysia (2012)Tabu search in audit scheduling (1998)Exploring bidding strategies for market-based scheduling (2004)Action variety of planners: Cognitive load and requisite variety (2006)
this work references cited by second hop

References

  • 1991Schedule Optimization Using Genetic Algorithms499 cited
  • 2002Recent research directions in automated timetabling433 cited
  • 2001Auction Protocols for Decentralized Scheduling431 cited
  • 2002A self‐adapting genetic algorithm for project scheduling under resource constraints268 cited
  • 2004Stability and resource allocation in project planning145 cited
  • 2016Planning and Scheduling124 cited
  • 1995Intelligent Scheduling Systems95 cited
  • 2004Generating robust schedules through temporal flexibility90 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work