SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Accounting for Transport Times in Planning Off-Site Shipment of Construction Materials
16 references·1 citing·41 second hop
Accounting for Transport Times in Planning Off-Site Shipment of Construction Materials (2015)Accounting for Transport Times in Plannin…Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study (2013)Causes of Delay in Constructi…Delay causes in Iran gas pipeline projects (2012)Delay causes in Iran gas pipe…Optimizing Material Procurement and Storage on Construction Sites (2010)Optimizing Material Procureme…Engineer-to-order supply chain management: A literature review and research agenda (2009)Engineer-to-order supply chai…Construction Supply Chain Management Handbook (2008)Construction Supply Chain Man…Causes of Delay in Building Construction Projects in Egypt (2008)Causes of Delay in Building C…Causes and effects of delays in Malaysian construction industry (2007)Causes and effects of delays …Information systems development within supply chain management (2004)Information systems developme…Strategic positioning of the order penetration point (2003)Strategic positioning of the …Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Performance measurement in construction logistics (2001)Performance measurement in co…The four roles of supply chain management in construction (2000)The four roles of supply chai…The Agile Supply Chain (2000)The Agile Supply ChainConstruction delay: a quantitative analysis (2000)Construction delay: a quantit…Roles of supply chain management in construction (1999)Roles of supply chain managem…Managing Information about Processes (1995)Managing Information about Pr…Buffer space hedging enabled production time variation coordination in prefabricated construction (2019)Buffer space hedging enabled …Building Theories from Case Study Research (1989)The balanced scorecard : measures that drive performance (1992)The Knowledge-Creating Company (1998)Moving towards e‐government: a case study of organisational change processes (2003)PROCESS VIRTUALIZATION THEORY AND THE IMPACT OF INFORMATION TECHNOLOGY. (2005)Causes of Delay in Large Building Construction Projects (1995)How Many Interviews Are Enough? (2005)Causes of delay in large construction projects (2006)Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey (2012)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Machine Learning Algorithms for Construction Projects Delay Risk Prediction (2019)A comparative study of causes of time overruns in Hong Kong construction projects (1997)An Analytical Network Process model for risks prioritisation in megaprojects (2015)Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study (2017)Causes of delay in the global construction industry: a meta analytical review (2020)The machine that changed the world (1992)What is the Right Supply Chain for Your Product (1997)Conducting content‐analysis based literature reviews in supply chain management (2012)Integrating the environmental and social sustainability pillars into the lean and agile supply chain management paradigms: A literature review and future research directions (2017)What Are the Causes and Cures of Poor Megaproject Performance? A Systematic Literature Review and Research Agenda (2020)Out of the Crisis (1982)Logistics and Supply Chain Management: Strategies for Reducing Costs and Improving Services. (1994)Supply Chain Management: More Than a New Name for Logistics (1997)Innovation in construction: a sociology of technology approach (2005)Partnering relationships in construction: A literature review (2010)The effect of relationship management on project performance in construction (2011)Supply Chain Postponement and Speculation Strategies: How to choose the right strategy (1998)Engineering the leagile supply chain (2000)A review of production planning and control: the applicability of key concepts to the make-to-order industry (2005)Reconfigurable supply chain: the X-network (2020)Research methods for business: A skill building approach (1993)Analysing factors affecting delays in Indian construction projects (2011)Toyota production system: beyond large-scale production (1998)The organizational antecedents of a firm’s supply chain agility for risk mitigation and response (2008)Understanding the concept of supply chain resilience (2009)A Contingent Resource‐Based Perspective of Supply Chain Resilience and Robustness (2014)Significant factors causing delay in the UAE construction industry (2006)Delays in construction projects: The case of Jordan (2007)The significant factors causing delay of building construction projects in Malaysia (2007)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)
this work references cited by second hop

References

  • 2000The Agile Supply Chain1,950 cited
  • 2007Causes and effects of delays in Malaysian construction industry1,428 cited
  • 2000The four roles of supply chain management in construction866 cited
  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 2003Strategic positioning of the order penetration point616 cited
  • 2000Construction delay: a quantitative analysis555 cited
  • 2008Causes of Delay in Building Construction Projects in Egypt464 cited
  • 2009Engineer-to-order supply chain management: A literature review and research agenda382 cited
  • 1995Managing Information about Processes211 cited
  • 2012Delay causes in Iran gas pipeline projects192 cited
  • 2013Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study166 cited
  • 2001Performance measurement in construction logistics151 cited
  • 2008Construction Supply Chain Management Handbook148 cited
  • 2004Information systems development within supply chain management128 cited
  • 1999Roles of supply chain management in construction123 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2010Optimizing Material Procurement and Storage on Construction Sites104 cited
  • Cited by

    • 2019Buffer space hedging enabled production time variation coordination in prefabricated construction19 cited