Improving Project Management Decision Making by Modeling Quality, Time, and Cost Continuously
11 references·5 citing·35 second hop
Improving Project Management Decision Making by Modeling Quality, Time, and Cost Continuously (2013)Improving Project Management Decision Mak…Incorporating Quality Considerations Into Project Time/Cost Tradeoff Analysis and Decision Making (2006)Incorporating Quality Conside…Quality and Time-to-Market Trade-offs when There Are Multiple Product Generations (2001)Quality and Time-to-Market Tr…Time, cost and quality trade-off in project management: a case study (1999)Time, cost and quality trade-…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …Ensuring quality in resource constrained project scheduling (1997)Ensuring quality in resource …The Analytic Hierarchy Process (1996)The Analytic Hierarchy ProcessProject management with time, cost, and quality considerations (1996)Project management with time,…Project management : a systems approach to planning, scheduling, and controlling (1995)Project management : a system…Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Decisions with Multiple Objec…The Analytic Hierarchy Process (1985)The Analytic Hierarchy ProcessProject management: A systems approach to planning, scheduling and controlling (1982)Project management: A systems…Power in coordinating supply chain projects in humanitarian settings: A case study of Rohingya refugee camps (2024)Power in coordinating supply …Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem (2020)Optimizing temporary work and…MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM (2019)MULTI-OBJECTIVE SYMBIOTIC ORG…Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality (2018)Time Cost Quality Trade-off P…A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction (2016)A New Model for Solving Time-…A scaling method for priorities in hierarchical structures (1977)Incomplete pairwise comparisons in the analytic hierarchy process (1987)The analytic hierarchy process—what it is and how it is used (1987)A hybrid MCDM model for strategic vendor selection (2006)Intuitionistic fuzzy geometric aggregation operators based on einstein operations (2011)Analytic Hierarchy Process (2013)A Network Flow Computation for Project Cost Curves (1961)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management Guide to PERT/CPM (1969)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)Innovation: Mapping the winds of creative destruction (1985)Product development performance: strategy, organization, and management in the world auto industry (1991)Investing in product development and production capabilities: The crucial linkage between time-to-market and ramp-up time (2004)Industry Clockspeed and the Pace of New Product Development (2005)Coordinating new product development with supply chain management (2011)The Innovator's Dilemma (2011)SERVQUAL: A multiple-Item Scale for measuring consumer perceptions of service quality (1988)Project Acceleration via Activity Crashing, Overlapping, and Substitution (2008)Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization (2013)Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (2015)Critical-path planning and scheduling (1959)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)The role of project management in achieving project success (1996)Criteria of project success: an exploratory re-examination (1999)Current practice in project management — an empirical study (2002)Conjoint Analysis in Consumer Research: Issues and Outlook (1978)Risk management in a dynamic society: a modelling problem (1997)Best-worst multi-criteria decision-making method (2014)Ant colony optimization for resource-constrained project scheduling (2002)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Applications of the extent analysis method on fuzzy AHP (1996)Analytic hierarchy process: An overview of applications (2004)The Logical Framework Method for Defining Project Success (1999)
this work references cited by second hop

References

  • 1985The Analytic Hierarchy Process15,357 cited
  • 1994Decisions with Multiple Objectives: Preferences and Value Tradeoffs.8,369 cited
  • 1995Project management : a systems approach to planning, scheduling, and controlling3,100 cited
  • 1982Project management: A systems approach to planning, scheduling and controlling2,408 cited
  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1996The Analytic Hierarchy Process498 cited
  • 1996Project management with time, cost, and quality considerations274 cited
  • 1999Time, cost and quality trade-off in project management: a case study186 cited
  • 2006Incorporating Quality Considerations Into Project Time/Cost Tradeoff Analysis and Decision Making102 cited
  • 2001Quality and Time-to-Market Trade-offs when There Are Multiple Product Generations94 cited
  • 1997Ensuring quality in resource constrained project scheduling65 cited

Cited by

  • 2020Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem38 cited
  • 2019MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM37 cited
  • 2016A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction36 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2018Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality35 cited
  • 2024Power in coordinating supply chain projects in humanitarian settings: A case study of Rohingya refugee camps11 cited