SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Assessment of cost control systems: a case study of Thai construction organizations
8 references·0 citing·29 second hop
Assessment of cost control systems: a case study of Thai construction organizations (2001)Assessment of cost control systems: a cas…A survey of indirect cost estimating in practice (1994)A survey of indirect cost est…Applications of case study research (1993)Applications of case study re…Cost‐ and Schedule‐Control Integration: Issues and Needs (1991)Cost‐ and Schedule‐Control In…Measurement of Work Progress: Quantitative Technique (1989)Measurement of Work Progress:…Cost‐Estimating Principles (1989)Cost‐Estimating PrinciplesMeaning in Method: The Rhetoric of Quantitative and Qualitative Research (1987)Meaning in Method: The Rhetor…Financial and Cost Concepts for Construction Management (1985)Financial and Cost Concepts f…Qualitative Evaluation Methods (1981)Qualitative Evaluation MethodsThe Structure of Scientific Revolutions (1963)The Structure of Scientific Revolutions (1963)Mixing Qualitative and Quantitative Methods: Triangulation in Action (1979)Ways of Evaluating Teacher Cognition: Inferences Concerning the Goldilocks Principle (1990)Mixed-Method Research (1999)An overview of mixed methods research (2009)Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders (1989)Resource-based model for automatic cash-flow forecasting (1995)Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration (2002)Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control (2006)Professional Construction Management (1976)Project management — A managerial approach (1989)Applied Cost Engineering (1996)Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage (2018)Introduction to Case Study (1997)Social Capital: A Missing Link to Disaster Recovery (2004)Using Numbers in Qualitative Research (2010)Criteria for assessing the trustworthiness of naturalistic inquiries (1981)Determining Validity in Qualitative Inquiry (2000)Grounded Theory and Sensitizing Concepts (2006)Impact of Inaccurate Engineer’s Estimated Quantities on Unit Price Contracts (2009)Probabilistic simulation for developing likelihood distribution of engineering project cost (2009)Cost Estimation Model Using Modified Parameters for Construction Projects (2019)Procurement in the Construction Industry (2006)An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry (2007)Major Participants in the Construction Industry and Their Approaches to Risks: A Theoretical Framework (2017)Causes of failure of housing projects : case of unfinished buildings in Dar es Salaam (2005)Risk factors leading to cost overrun in the delivery of highway construction projects (2006)
this work references cited by second hop

References

  • 1993Applications of case study research7,853 cited
  • 1981Qualitative Evaluation Methods4,177 cited
  • 1987Meaning in Method: The Rhetoric of Quantitative and Qualitative Research737 cited
  • 1989Cost‐Estimating Principles84 cited
  • 1991Cost‐ and Schedule‐Control Integration: Issues and Needs74 cited
  • 1994A survey of indirect cost estimating in practice63 cited
  • 1985Financial and Cost Concepts for Construction Management39 cited
  • 1989Measurement of Work Progress: Quantitative Technique38 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work