SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
4 references·16 citing·32 second hop
The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs) (1992)The Analysis of Activity Networks Under G…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Critical-Path Planning and Scheduling (1959)Critical-Path Planning and Sc…Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Optimizing time–cost in gener…Project cost–quality–risk tradeoff analysis in a time-constrained problem (2016)Project cost–quality–risk tra…Project Management with Dynamic Scheduling (2012)Project Management with Dynam…Optimal methods for resource allocation and scheduling: a cross-disciplinary survey (2012)Optimal methods for resource …Maximizing the net present value of a project under uncertainty (2009)Maximizing the net present va…A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution (2008)A multi-mode resource-constra…The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)The discrete time/cost trade-…Time-Cost Optimization of Construction Projects with Generalized Activity Constraints (2005)Time-Cost Optimization of Con…Project time–cost analysis under generalised precedence relations (2004)Project time–cost analysis un…New computational results for the discrete time/cost trade-off problem with time-switch constraints (2004)New computational results for…Project scheduling with inventory constraints (2003)Project scheduling with inven…A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints (2000)A Time-Oriented Branch-and-Bo…The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)The multi-mode resource-const…A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (1998)A branch-and-bound procedure …A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem (1997)A Branch-and-Bound Procedure …Activity nets: A guided tour through some recent developments (1995)Activity nets: A guided tour …A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Project management : a systems approach to planning, scheduling, and controlling (1995)A review of the contribution of Operational Research to Project Management (2002)Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling (2001)Lower bounds for resource-constrained project scheduling problems (2003)Robust optimization models for project scheduling with resource availability cost (2006)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem (2007)Skilled workforce scheduling in Service Centres (2007)An improved MIP-based approach for a multi-skill workforce scheduling problem (2011)Critical-path planning and scheduling (1959)A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem (2011)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Scheduling project networks with resource constraints and time windows (1988)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type (2010)Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems (2017)Application of a Technique for Research and Development Program Evaluation (1959)Benchmark Instances for Project Scheduling Problems (1999)Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling (1999)On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints (2001)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)An integrated survey of deterministic project scheduling (2001)The discrete time-cost tradeoff problem revisited (1995)Project management with time, cost, and quality considerations (1996)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)A Simple CPM Time-Cost Tradeoff Algorithm (1971)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1977Activity networks: Project planning and control by network models575 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 1959Critical-Path Planning and Scheduling283 cited

Cited by

  • 1999The multi-mode resource-constrained project scheduling problem with generalized precedence relations149 cited
  • 1998A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations143 cited
  • 1995Activity nets: A guided tour through some recent developments139 cited
  • 2007The discrete time/cost trade-off problem: extensions and heuristic procedures132 cited
  • 2005Time-Cost Optimization of Construction Projects with Generalized Activity Constraints129 cited
  • 2000A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints116 cited
  • 2012Project Management with Dynamic Scheduling105 cited
  • 2003Project scheduling with inventory constraints103 cited
  • 2008A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution93 cited
  • 2009Maximizing the net present value of a project under uncertainty

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

82 cited
  • 2004New computational results for the discrete time/cost trade-off problem with time-switch constraints72 cited
  • 2020Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods71 cited
  • 2016Project cost–quality–risk tradeoff analysis in a time-constrained problem66 cited
  • 2012Optimal methods for resource allocation and scheduling: a cross-disciplinary survey64 cited
  • 1997A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem64 cited
  • 2004Project time–cost analysis under generalised precedence relations62 cited