Identifying the critical sequence in a resource constrained project
8 references·8 citing·37 second hop
Identifying the critical sequence in a resource constrained project (1988)Identifying the critical sequence in a re…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation (1976)Heuristics for Scheduling Res…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…Alternate methods of project scheduling with limited resources (1973)Alternate methods of project …An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)An Algorithm for Optimal Proj…PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS. (1968)PROJECT SCHEDULING WITH RESOU…Some Properties of Schedules for Large Projects with Limited Resources (1964)Some Properties of Schedules …Establishing the Digital Transformation Strategies for the Med-Tech Enterprises Based on the AIA-NRM Approach (2020)Establishing the Digital Tran…Understanding Construction Delay Analysis and the Role of Preconstruction Programming (2013)Understanding Construction De…The coordination processes and dynamics within the inter-organizational context of contract-based outsourced engineering projects (2013)The coordination processes an…Tying the pieces together: A normative framework for integrating sales and project operations (2006)Tying the pieces together: A …Evaluation of the Resource-Constrained Critical Path Method Algorithms (2005)Evaluation of the Resource-Co…Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment (2004)Identification and illuminati…Phantom Float (2003)Phantom FloatAn efficient method for scheduling construction projects with resource constraints (2001)An efficient method for sched…Application of a Technique for Research and Development Program Evaluation (1959)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A survey on the resource-constrained project scheduling problem (1995)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Statistical principles in experimental design. (1962)A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)A new heuristic solution method in resource-constrained project scheduling (1991)Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs (1997)Decision-Making over the Project Life Cycle: An Analytical Hierarchy Approach (1999)Out of the Crisis (1982)Project management — A managerial approach (1989)A Guide to the project management body of knowledge (1996)Pipeline management for the acquisition of industrial projects (2010)Aligning sales and operations management: an agenda for inquiry (2018)Critical-Path Planning and Scheduling: Mathematical Basis (1961)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Journal of Industrial Engineering (2017)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource-Activity Critical-Path Method for Construction Planning (2003)Schedule Analysis under the Effect of Resource Allocation (2007)A scheduling methodology for dealing with uncertainty in construction projects (2011)The Stochastic Resource-Constrained Project Scheduling Problem (2014)Resource-constrained project scheduling by simulated annealing (1996)A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)Critical Chain Project Scheduling: Do Not Oversimplify (2002)The project scheduling polyhedron: Dimension, facets and lifting theorems (1993)Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (2014)Multi-mode resource-constrained project scheduling problem with alternative project structures (2018)AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS (1989)Project Scheduling Problems: A Survey (1993)A genetic algorithm for resource-constrained scheduling (1996)Project scheduling with resource constraints: A branch and bound approach (1987)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)
this work references cited by second hop

References

  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 1976Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation174 cited
  • 1964Some Properties of Schedules for Large Projects with Limited Resources166 cited
  • 1971An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints165 cited
  • 1968PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS.106 cited
  • 1973Alternate methods of project scheduling with limited resources86 cited

Cited by

  • 2005Evaluation of the Resource-Constrained Critical Path Method Algorithms57 cited
  • 2006Tying the pieces together: A normative framework for integrating sales and project operations50 cited
  • 2001An efficient method for scheduling construction projects with resource constraints50 cited
  • 2004Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment48 cited
  • 2013Understanding Construction Delay Analysis and the Role of Preconstruction Programming47 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2003
Phantom Float
38 cited