SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
On the use of the complexity index as a measure of complexity in activity networks
10 references·11 citing·40 second hop
On the use of the complexity index as a measure of complexity in activity networks (1996)On the use of the complexity index as a m…Optimal procedures for the discrete time/cost trade-off problem in project networks (1996)Optimal procedures for the di…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)HEURISTIC ALGORITHMS FOR RESO…Advances in Project Scheduling (1989)Advances in Project SchedulingAdvances in project scheduling (1989)Advances in project schedulingMulti-Project Scheduling: Analysis of Project Performance (1985)Multi-Project Scheduling: Ana…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …Project scheduling: The effects of problem structure on heuristic performance (1976)Project scheduling: The effec…Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation (1976)Heuristics for Scheduling Res…Going to the core of hard resource-constrained project scheduling instances (2020)Going to the core of hard res…Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem (2020)Automatic detection of the be…A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)A Parallel Branch and Bound A…Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms (2015)Taking advantage of solving t…An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (2013)An automatic algorithm select…An artificial immune system algorithm for the resource availability cost problem (2011)An artificial immune system a…A random generator of resource-constrained multi-project network problems (2009)A random generator of resourc…New computational results for the discrete time/cost trade-off problem with time-switch constraints (2004)New computational results for…Case-based reasoning and improved adaptive search for project scheduling (2000)Case-based reasoning and impr…Phase Transitions in Project Scheduling (1999)Phase Transitions in Project …dagen: A generator of testsets for project activity nets (1996)dagen: A generator of testset…Some Properties of Schedules for Large Projects with Limited Resources (1964)An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions (1986)The trade-off between stability and makespan in resource-constrained project scheduling (2005)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Activity networks: Project planning and control by network models (1977)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)A Network Flow Computation for Project Cost Curves (1961)Project Management With Cpm, Pert and Precedence Diagramming (1983)The discrete time-cost tradeoff problem revisited (1995)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Robust scheduling and robustness measures for the discrete time/cost trade-off problem (2010)Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project (2012)Application of a Technique for Research and Development Program Evaluation (1959)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Design and Analysis of Industrial Experiments. (1955)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING (1993)Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics (1993)A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)Statistical principles in experimental design. (1962)Resource-constrained project scheduling by simulated annealing (1996)A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)Critical-path planning and scheduling (1959)Project scheduling with resource constraints: A branch and bound approach (1987)A genetic algorithm approach to a general category project scheduling problem (1999)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)The project scheduling polyhedron: Dimension, facets and lifting theorems (1993)Project Scheduling Under Partially Renewable Resource Constraints (1999)Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (2005)Project network models with discounted cash flows a guided tour through recent developments (1997)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)
this work references cited by second hop

References

  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1989Advances in Project Scheduling196 cited
  • 1989HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS195 cited
  • 1976Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation174 cited
  • 1996Optimal procedures for the discrete time/cost trade-off problem in project networks157 cited
  • 1976Project scheduling: The effects of problem structure on heuristic performance142 cited
  • 1985Multi-Project Scheduling: Analysis of Project Performance141 cited
  • 1989Advances in project scheduling99 cited

Cited by

  • 2000Case-based reasoning and improved adaptive search for project scheduling72 cited
  • 2004New computational results for the discrete time/cost trade-off problem with time-switch constraints72 cited
  • 2013An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem68 cited
  • 1999Phase Transitions in Project Scheduling

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

66 cited
  • 2009A random generator of resource-constrained multi-project network problems55 cited
  • 2020Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem54 cited
  • 2015Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms48 cited
  • 1996dagen: A generator of testsets for project activity nets44 cited
  • 2020Going to the core of hard resource-constrained project scheduling instances42 cited
  • 2016A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags41 cited
  • 2011An artificial immune system algorithm for the resource availability cost problem38 cited