No open-access location is known for this record yet.
No open-access location is known for this record yet.
The result of a preliminary survey of factors affecting construction time is described. The objective of the survey which was conducted in the UK was to prioritize factors which are taken into consideration by accomplished contractors in planning the construction time of buildings, A significant degree of consistency in ranking ‘time-influencing factors’ was found. The most important factors are apparently those which can readily be identified or deduced from project information and whose impact on construction time can generally be assessed explicitly by mathematical and judgemental analyses.
Loading…
Stored only when both papers are in the corpus — 91 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.