SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction time-influencing factors: the contractor's perspective
2 references·16 citing·48 second hop
Construction time-influencing factors: the contractor's perspective (1995)Construction time-influencing factors: th…Designing Experiments and Analysing Data: A Model Comparison Perspective. (1991)Designing Experiments and Ana…Practical Research: Planning and Design (1990)Practical Research: Planning …Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study (2021)Causes of Problems in Post-Di…Novel Approach to Estimating Schedule to Completion in Construction Projects Using Sequence and Nonsequence Learning (2019)Novel Approach to Estimating …Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia (2019)Major Factors Causing Delay i…Estimating time performance for building construction projects in Vietnam (2013)Estimating time performance f…Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria (2013)Analysis of non-excusable del…A study of the factors affecting construction time in Western Australia (2012)A study of the factors affect…DEVELOPING A CONSTRUCTION-DURATION MODEL BASED ON A HISTORICAL DATASET FOR BUILDING PROJECT / STATYBŲ PROJEKTO REALIZAVIMO TRUKMĖS MODELIO, PAGRĮSTO ISTORINIAIS DUOMENIMIS, KŪRIMAS (2011)DEVELOPING A CONSTRUCTION-DUR…An evaluation of risk factors impacting construction cash flow forecast (2008)An evaluation of risk factors…Procurement in the Construction Industry (2006)Procurement in the Constructi…Factors influencing the construction time of civil engineering projects in Malaysia (2006)Factors influencing the const…Nature of the critical risk factors affecting project performance in Indonesian building contracts (2005)Nature of the critical risk f…Developing a benchmark model for project construction time performance in Hong Kong (2003)Developing a benchmark model …A different approach to construction labour in Turkey: comparative productivity analysis (2003)A different approach to const…Effects of overtime work and additional resources on project cost and quality (2000)Effects of overtime work and …Modelling building durations in Hong Kong (1999)Modelling building durations …Application of artificial neural network to forecast construction duration of buildings at the predesign stage (1999)Application of artificial neu…The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects (1985)A study of the factors affecting construction durations in Hong Kong (1995)An investigation into construction time performance (1995)Financing Construction: Cash Flows and Cash Farming (2003)Approximately predicting the cost and duration of school reconstruction projects in Taiwan (2006)Estimation of Time for Wenchuan Earthquake Reconstruction in China (2010)Business Research Methods (1984)Surveys in Social Research (1987)Measuring and benchmarking managerial efficiency of project execution schedule performance (2015)Understanding the underlying reasons behind time overruns of government building projects in Ghana (2015)Application of neural networks and neuro-fuzzy models in construction scheduling (2023)Measurement of project success (1988)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia (2010)Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam (2019)Risk Management and Construction (1993)Managing Risk in Construction Projects (1998)Modern Construction Management (2012)Critical factors influencing the bid/no bid decision in the Australian construction industry (2016)Improving the risk quantification under behavioural tendencies: A tale of construction projects (2018)Construction supply chain risk management (2024)Causes and effects of delays in Malaysian construction industry (2007)Understanding the key risks in construction projects in China (2007)The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance (2016)Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects (2019)Impact of Construction Delay-Controlling Parameters on Project Schedule: DEMATEL-System Dynamics Modeling Approach (2022)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Delays in construction projects: The case of Jordan (2007)Analysing factors affecting delays in Indian construction projects (2011)Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)Explainable machine learning for project management control (2023)Using Machine Learning to Improve Cost and Duration Prediction Accuracy in Green Building Projects (2023)Causes of delay in large construction projects (2006)Understanding Reliability and Validity in Qualitative Research (2015)Using Ambient Intelligence ‘AMI’ to Manage Disaster Risk Reduction ‘DRR’ (2024)The Nature of the Firm (1937)The Problem of Social Cost (1960)The Economic Institutions of Capitalism (1987)Procurement innovation for public construction projects (2013)Transaction costs incurred by construction owners (2014)Estimating transaction costs in the New Zealand construction procurement (2015)Qualitative research: Methods in the social sciences (2006)Organizational culture and knowledge sharing: critical success factors (2007)QUALITATIVE RESEARCH METHODOLOGY IN SOCIAL SCIENCES AND RELATED SUBJECTS (2018)A Critique and Improvement of the CL Common Language Effect Size Statistics of McGraw and Wong (2000)Generalized Eta and Omega Squared Statistics: Measures of Effect Size for Some Common Research Designs. (2003)Calculating and reporting effect sizes to facilitate cumulative science: a practical primer for t-tests and ANOVAs (2013)
this work references cited by second hop

References

  • 1990Practical Research: Planning and Design9,309 cited
  • 1991Designing Experiments and Analysing Data: A Model Comparison Perspective.1,229 cited

Cited by

  • 2008An evaluation of risk factors impacting construction cash flow forecast83 cited
  • 2019Novel Approach to Estimating Schedule to Completion in Construction Projects Using Sequence and Nonsequence Learning65 cited
  • 2003Developing a benchmark model for project construction time performance in Hong Kong63 cited
  • 2021Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study55 cited
  • 2006Factors influencing the construction time of civil engineering projects in Malaysia54 cited
  • 1999Modelling building durations in Hong Kong54 cited
  • 2013Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria52 cited
  • 2006Procurement in the Construction Industry51 cited
  • 2012A study of the factors affecting construction time in Western Australia49 cited
  • 2003A different approach to construction labour in Turkey: comparative productivity analysis45 cited
  • 2000Effects of overtime work and additional resources on project cost and quality45 cited
  • 1999Application of artificial neural network to forecast construction duration of buildings at the predesign stage

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

44 cited
  • 2005Nature of the critical risk factors affecting project performance in Indonesian building contracts40 cited
  • 2019Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia40 cited
  • 2013Estimating time performance for building construction projects in Vietnam40 cited
  • 2011DEVELOPING A CONSTRUCTION-DURATION MODEL BASED ON A HISTORICAL DATASET FOR BUILDING PROJECT / STATYBŲ PROJEKTO REALIZAVIMO TRUKMĖS MODELIO, PAGRĮSTO ISTORINIAIS DUOMENIMIS, KŪRIMAS39 cited