SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Location‐Based Management for Construction: Planning, Scheduling and Control
0 references·10 citing·43 second hop
Location‐Based Management for Construction: Planning, Scheduling and Control (2011)Location‐Based Management for Constructio…Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning (2023)Adaptive control of resource …Propositions for a Resilient, Post-COVID-19 Future for the AEC Industry (2021)Propositions for a Resilient,…Enhanced Repetitive-Scheduling Computation and Visualization (2020)Enhanced Repetitive-Schedulin…Determining the Relationship between Direct Work and Construction Labor Productivity in North America: Four Decades of Insights (2020)Determining the Relationship …Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Survey Comparing Critical Pat…Improving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)Improving workflow and resour…What constitutes good production flow in construction? (2016)What constitutes good product…Impacts of the Social Subcontract and Last Planner System Interventions on the Trade-Crew Workflows of Multistory Residential Construction Projects (2016)Impacts of the Social Subcont…Automated progress monitoring system for linear infrastructure projects using satellite remote sensing (2016)Automated progress monitoring…The Last Planner System in China's construction industry — A SWOT analysis on implementation (2014)The Last Planner System in Ch…An Integrative Model Of Organizational Trust (1995)Constructing grounded theory : a practical guide through qualitative analysis (2006)Constructing Grounded Theory. A Practical Guide Through Qualitative Analysis (2006)A multiple correspondence analysis model for evaluating technology foresight methods (2017)Effects of Lean Six Sigma in program management (2019)Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives (2020)The analytic hierarchy process : planning, priority setting, resource allocation (1980)Networks and Organizations: Structure, Form, and Action. (1994)An exploration towards a production theory and its application to construction (2000)Framework for Managing Integration Challenges of Last Planner System in IMPs (2018)Causes, Early Warning Signs, and Impacts of Out-of-Sequence Construction: Expert-Based Survey Analysis (2019)Planning Construction of Repetitive Building Units (1974)Construction Planning for Linear Projects (1980)Application of Linear Scheduling (1986)Lean Thinking-Banish Waste and Create Wealth in Your Corporation. (1997)Toyota production system: beyond large-scale production (1998)Investigating the Relationship between Construction Supply Chain Integration and Sustainable Use of Material: Evidence from China (2018)Value creation dynamics in a project alliance (2019)Improving green performance of construction projects through supply chain integration: The role of environmental knowledge (2021)Case Study Research: Design and Methods (1984)Qualitative evaluation and research methods (1990)Case Study Research: Design and Methods (1991)Survey research in operations management: a process‐based perspective (2002)A guide to the project management body of knowledge (PMBOK guide) (2004)Utilizing Large Language Models to Illustrate Constraints for Construction Planning (2024)Productivity improvement in construction (1988)A power primer. (1992)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)Systematic Review of the Literature on Construction Productivity (2023)Line‐of‐Balance Scheduling in Pavement Construction (1986)Linear Scheduling Model: Development of Controlling Activity Path (1998)Challenges in Line-of-Balance Scheduling (2002)Linear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units (2021)Schedule optimization for scattered repetitive projects (2021)Portfolio Selection: Efficient Diversification of Investments (1959)Crisis Construction and Organizational Learning: Capability Building in Catching-up at Hyundai Motor (1998)A critical analysis of the impacts of COVID-19 on the global economy and ecosystems and opportunities for circular economy strategies (2020)Responses to the COVID-19 pandemic in the construction industry: a literature review of academic research (2023)Management of production in construction: A theoretical view (1999)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Causes of delays on construction projects: a comprehensive list (2019)Automated construction scheduling using deep reinforcement learning with valid action sampling (2024)Leveraging Artificial Intelligence in Project Management: A Systematic Review of Applications, Challenges, and Future Directions (2025)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2016What constitutes good production flow in construction?100 cited
  • 2014The Last Planner System in China's construction industry — A SWOT analysis on implementation70 cited
  • 2019Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques68 cited
  • 2016Automated progress monitoring system for linear infrastructure projects using satellite remote sensing61 cited
  • 2020Determining the Relationship between Direct Work and Construction Labor Productivity in North America: Four Decades of Insights56 cited
  • 2023Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning54 cited
  • 2018Improving workflow and resource usage in construction schedules through location-based management system (LBMS)46 cited
  • 2020Enhanced Repetitive-Scheduling Computation and Visualization40 cited
  • 2016Impacts of the Social Subcontract and Last Planner System Interventions on the Trade-Crew Workflows of Multistory Residential Construction Projects33 cited
  • 2021Propositions for a Resilient, Post-COVID-19 Future for the AEC Industry31 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work