SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Nonlinear time/cost tradeoff models in project management
4 references·14 citing·36 second hop
Nonlinear time/cost tradeoff models in project management (1995)Nonlinear time/cost tradeoff models in pr…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Microeconomic Theory: A Mathematical Approach (1959)Microeconomic Theory: A Mathe…A Linear Decision Rule for Production and Employment Scheduling (1955)A Linear Decision Rule for Pr…Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects (2021)Multiple Objective Social Gro…Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Optimizing time–cost in gener…A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation (2020)A multi-agent based cooperati…A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration (2018)A robust scheduling for the m…Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm (2017)Gas and oil project time-cost…Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Time–Cost Optimization Model …Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization (2013)Solution to the Time-Cost-Qua…Time-Cost Tradeoff Analysis in Project Management: An Ant System Approach (2010)Time-Cost Tradeoff Analysis i…Project time–cost trade-off scheduling: a hybrid optimization approach (2010)Project time–cost trade-off s…Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type (2010)Planning-stage estimation of …Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation (2009)Ant colony optimization algor…The stochastic time–cost tradeoff problem: A robust optimization approach (2006)The stochastic time–cost trad…Performing complex project crashing analysis with aid of particle swarm optimization algorithm (2006)Performing complex project cr…Impact of Budget Uncertainty on Project Time-Cost Tradeoff (2005)Impact of Budget Uncertainty …Project management with time, cost, and quality considerations (1996)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)A review of research on cost of quality models and best practices (2006)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects (2024)Project Management With Cpm, Pert and Precedence Diagramming (1983)Statistical and Econometric Methods for Transportation Data Analysis (2003)Cost escalation and schedule delays in road construction projects in Zambia (2008)Simulating Construction Duration for Multistory Buildings with Controlling Activities (2013)Time–cost relationship for predicting construction duration (2013)Leveraging Artificial Intelligence in Project Management: A Systematic Review of Applications, Challenges, and Future Directions (2025)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Applying the design structure matrix to system decomposition and integration problems: a review and new directions (2001)Optimum budget allocation method for projects with critical risks (2012)Identifying the gaps in construction megaproject management research: a bibliographic analysis (2020)Performance measurement methods in megaprojects: An analytical review (2022)Application of a Technique for Research and Development Program Evaluation (1959)An integrated survey of deterministic project scheduling (2001)Critical-path planning and scheduling (1959)Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm (2021)Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects (2023)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Worst-Case Equilibria (1999)New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers (2021)Robust solutions of Linear Programming problems contaminated with uncertain data (2000)Adjustable robust solutions of uncertain linear programs (2004)A Three-Stage Manpower Planning and Scheduling Model—A Service-Sector Example (1973)A stochastic aggregate production planning model in a green supply chain: Considering flexible lead times, nonlinear purchase and shortage cost functions (2013)A survey of adjustable robust optimization (2018)The discrete time-cost tradeoff problem revisited (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Rewards and Punishments as Selective Incentives for Collective Action: Theoretical Investigations (1980)Preference, Value, Choice, and Welfare (2011)The moderating effect of customer perceived value on online shopping behaviour (2011)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1959Microeconomic Theory: A Mathematical Approach813 cited
  • 1955A Linear Decision Rule for Production and Employment Scheduling389 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited

Cited by

  • 2013Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization83 cited
  • 2010Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type78 cited
  • 2020Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods71 cited
  • 2020A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation63 cited
  • 2006The stochastic time–cost tradeoff problem: A robust optimization approach57 cited
  • 2006Performing complex project crashing analysis with aid of particle swarm optimization algorithm56 cited
  • 2005Impact of Budget Uncertainty on Project Time-Cost Tradeoff52 cited
  • 2018A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration49 cited
  • 2015Time–Cost Optimization Model Considering Float-Consumption Impact48 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2010Time-Cost Tradeoff Analysis in Project Management: An Ant System Approach44 cited
  • 2009Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation42 cited
  • 2017Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm40 cited
  • 2021Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects40 cited
  • 2010Project time–cost trade-off scheduling: a hybrid optimization approach38 cited