Construction resource leveling using neural networks
6 references·1 citing·20 second hop
Construction resource leveling using neural networks (1996)Construction resource leveling using neur…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Resource Management in Construction (1986)Resource Management in Constr…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Construction performance control by networks (1976)Construction performance cont…Critical path methods in construction practice (1970)Critical path methods in cons…IMPACTS OF DIFFERENT OBJECTIVE FUNCTIONS ON RESOURCE LEVELING IN CONSTRUCTION PROJECTS: A CASE STUDY (2014)IMPACTS OF DIFFERENT OBJECTIV…Construction Productivity Improvement (1985)A study of project scheduling optimization using Tabu Search algorithm (2008)Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting (2010)Optimization model for construction project resource leveling using a novel modified symbiotic organisms search (2018)Operations Research -- An Introduction (1980)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Journal of Industrial Engineering (2017)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa (2011)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Mixed-integer linear programming for resource leveling problems (2012)Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs (1997)Applying Modified Minimum Moment Method to Multiple Resource Leveling (2001)The resource renting problem subject to temporal constraints (2001)
this work references cited by second hop

References

  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 1970Critical path methods in construction practice145 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 1976Construction performance control by networks94 cited
  • 1986Resource Management in Construction72 cited

Cited by

  • 2014IMPACTS OF DIFFERENT OBJECTIVE FUNCTIONS ON RESOURCE LEVELING IN CONSTRUCTION PROJECTS: A CASE STUDY40 cited