SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Two modifications of the least cost per period heuristic for dynamic lot-sizing
16 references·3 citing·31 second hop
Two modifications of the least cost per period heuristic for dynamic lot-sizing (2005)Two modifications of the least cost per p…Production and Operations Analysis (2019)Production and Operations Ana…Dynamic Version of the Economic Lot Size Model (2004)Dynamic Version of the Econom…Dynamic demand lot-sizing rules for incremental quantity discounts (2002)Dynamic demand lot-sizing rul…Inventory management and production planning and scheduling (1999)Inventory management and prod…Production: Planning, Control and Integration (1997)Production: Planning, Control…Production & Operations Management : Quality, Performance, and Value (1997)Production & Operations Manag…Production and Operations Analysis (1992)Production and Operations Ana…The behavior of lot‐sizing procedures in the presence of forecast errors (1989)The behavior of lot‐sizing pr…Evaluation of lot-sizing techniques (1986)Evaluation of lot-sizing tech…A methodology for predicting single‐stage lot‐sizing performance: Analysis and experiments (1985)A methodology for predicting …Two Modifications Of The Silver-Meal Lot Sizing Heuristic (1984)Two Modifications Of The Silv…Lot-sizing under uncertainty in a rolling schedule environment (1984)Lot-sizing under uncertainty …A Comparison of Dynamic Lot Sizing Rules for Use in a Single Stage MRP System with Demand Uncertainty (1984)A Comparison of Dynamic Lot S…HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* (1980)HEURISTIC LOT‐SIZING PERFORMA…An economic lot-sizing technique, I: The part-period algorithm (1968)An economic lot-sizing techni…Dynamic Version of the Economic Lot Size Model (1958)Dynamic Version of the Econom…Spare Parts Inventory Control for Non-Repairable Items Based on Prognostics and Health Monitoring Information (2012)Spare Parts Inventory Control…Lot-Size Planning with Non-Linear Cost Functions Supporting Environmental Sustainability (2010)Lot-Size Planning with Non-Li…Lot-Size Planning with Non-linear Cost Functions Supporting Environmental Sustainability (2010)Lot-Size Planning with Non-li…Production and inventory management (1983)The relative significance of forecast errors in multistage manufacturing (1993)The effect of lot sizing rules on order variability (2003)The development of a hierarchical forecasting method for predicting spare parts demand in the South Korean Navy—A case study (2012)International Journal of Production Research (1962)Experimental Design: Procedures for the Behavioral Sciences. (1969)Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty (1995)A simulation framework for forecasting uncertain lumpy demand (1999)Demand forecasting by temporal aggregation (2013)Experimental Design: Procedures for the Behavioral Sciences (2013)Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results (1975)Purchasing Policy of New Containers Considering the Random Returns of Previously Issued Containers (1989)A theory of rolling horizon decision making (1991)Rolling horizon planning in supply chains: review, implications and directions for future research (2013)The single-period (news-vendor) problem: literature review and suggestions for future research (1999)Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research (2002)Supply Chain Coordination with Contracts (2003)Project Control: Literature Review (2006)Measuring the efficacy of inventory with a dynamic input–output model (2009)Production planning and control for remanufacturing: literature review and analysis (2011)Commissioned Paper: Capacity Management, Investment, and Hedging: Review and Recent Developments (2003)Group Buying on the Web: A Comparison of Price-Discovery Mechanisms (2003)Quality Improvement Incentives and Product Recall Cost Sharing Contracts (2009)Optimal Multi-Level Lot Sizing for Requirements Planning Systems (1980)A classification of literature on determining the lot size under quantity discounts (1996)A sustainable EOQ model: Theoretical formulation and applications (2013)Perishable Inventory Theory: A Review (1982)Network Design and Transportation Planning: Models and Algorithms (1984)Quantitative models for reverse logistics: A review (1997)Sources of Supply Chain Disruptions, Factors That Breed Vulnerability, and Mitigating Strategies (2009)Smart “Predict, then Optimize” (2021)
this work references cited by second hop

References

  • 1999Inventory management and production planning and scheduling2,787 cited
  • 1958Dynamic Version of the Economic Lot Size Model2,068 cited
  • 2004Dynamic Version of the Economic Lot Size Model2,055 cited
  • 1992Production and Operations Analysis1,213 cited
  • 2019Production and Operations Analysis938 cited
  • 1997Production: Planning, Control and Integration211 cited
  • 1980HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*191 cited
  • 1968An economic lot-sizing technique, I: The part-period algorithm190 cited
  • 1984Lot-sizing under uncertainty in a rolling schedule environment109 cited
  • 1989The behavior of lot‐sizing procedures in the presence of forecast errors50 cited
  • 1984Two Modifications Of The Silver-Meal Lot Sizing Heuristic42 cited
  • 1997Production & Operations Management : Quality, Performance, and Value42 cited
  • 1984A Comparison of Dynamic Lot Sizing Rules for Use in a Single Stage MRP System with Demand Uncertainty32 cited
  • 1986Evaluation of lot-sizing techniques30 cited
  • 2002Dynamic demand lot-sizing rules for incremental quantity discounts28 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

1985
A methodology for predicting single‐stage lot‐sizing performance: Analysis and experiments
18 cited

Cited by

  • 2012Spare Parts Inventory Control for Non-Repairable Items Based on Prognostics and Health Monitoring Information14 cited
  • 2010Lot-Size Planning with Non-linear Cost Functions Supporting Environmental Sustainability14 cited
  • 2010Lot-Size Planning with Non-Linear Cost Functions Supporting Environmental Sustainability12 cited