Improved Genetic Algorithm for Finance-Based Scheduling
14 references·5 citing·36 second hop
Improved Genetic Algorithm for Finance-Based Scheduling (2012)Improved Genetic Algorithm for Finance-Ba…Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio (2011)Multiobjective evolutionary f…Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio (2010)Multiobjective Evolutionary F…GA-based multi-objective optimization of finance-based construction project scheduling (2010)GA-based multi-objective opti…Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities (2009)Finance‐based CPM/LOB schedul…Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules (2006)Expanding Finance-Based Sched…A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (2006)A genetic algorithm for resou…A genetic algorithm for resource investment problem with discounted cash flows (2006)A genetic algorithm for resou…Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms (2005)Finance-Based Scheduling: Too…Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Project Scheduling with Multiple Modes: A Genetic Algorithm (2001)Project Scheduling with Multi…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…Schedule Optimization Using Genetic Algorithms (1991)Schedule Optimization Using G…P-GWO and MOFA: two new algorithms for the MSRCPSP with the deterioration effect and financial constraints (case study of a gas treating company) (2020)P-GWO and MOFA: two new algor…Survey of quantitative methods in construction (2017)Survey of quantitative method…Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN (2017)Management-Reserve Estimation…A max-min ant system for the finance-based scheduling problem (2017)A max-min ant system for the …Impacts of different objective functions on resource leveling in Line-of-Balance scheduling (2015)Impacts of different objectiv…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)PSPLIB - A project scheduling problem library (1997)Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)MULTIOBJECTIVE OPTIMIZATION MODEL FOR SCHEDULING OF CONSTRUCTION PROJECTS UNDER EXTREME WEATHER (2016)Time-cost tradeoff analysis with minimized project financing cost (2018)Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms (2020)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiple Attribute Decision Making (1981)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)The discrete time-cost tradeoff problem revisited (1995)Heuristic method for multi‐project finance‐based scheduling (2009)Generic Scheduling Optimization Model for Multiple Construction Projects (2017)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm (2007)Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (2010)A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities (2013)Simplified Spreadsheet Solutions. II: Overall Schedule Optimization (2001)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)A genetic algorithm approach to a general category project scheduling problem (1999)Location allocation modeling for healthcare facility planning in Malaysia (2012)Optimized acceleration of repetitive construction projects (2013)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)
this work references cited by second hop

References

  • 1991Schedule Optimization Using Genetic Algorithms499 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 2001Project Scheduling with Multiple Modes: A Genetic Algorithm286 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 2006A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty124 cited
  • 2005Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms110 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 2006Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules54 cited
  • 2010GA-based multi-objective optimization of finance-based construction project scheduling51 cited
  • 2006A genetic algorithm for resource investment problem with discounted cash flows51 cited
  • 2009Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities50 cited
  • 2011Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio40 cited
  • 2010Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio39 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Cited by

  • 2017Survey of quantitative methods in construction34 cited
  • 2017A max-min ant system for the finance-based scheduling problem33 cited
  • 2017Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN32 cited
  • 2020P-GWO and MOFA: two new algorithms for the MSRCPSP with the deterioration effect and financial constraints (case study of a gas treating company)31 cited
  • 2015Impacts of different objective functions on resource leveling in Line-of-Balance scheduling29 cited