Optimal Planning and Scheduling for Repetitive Construction Projects
3 references·16 citing·42 second hop
Optimal Planning and Scheduling for Repetitive Construction Projects (2005)Optimal Planning and Scheduling for Repet…Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost-Quality Trade-Off A…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Decision analysis and behavioral research (1986)Decision analysis and behavio…An expert system for highway construction: Multi-objective optimization using enhanced particle swarm for optimal equipment management (2024)An expert system for highway …Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects (2023)Modified dynamic opposite lea…Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm (2021)Tradeoff time cost quality in…Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Optimizing time–cost in gener…Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects (2019)Multipurpose linear programmi…Multi-objective optimization for repetitive scheduling under uncertainty (2019)Multi-objective optimization …Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Schedule risk analysis of inf…Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Opposition multiple objective…Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions (2016)Linear scheduling with multip…Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic (2016)Genetic Algorithm–Based Metho…Multi-objective genetic optimization for scheduling a multi-storey building (2014)Multi-objective genetic optim…Optimizing linear project scheduling with multi-skilled crews (2012)Optimizing linear project sch…A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…Model for Predicting the Performance of Project Managers at the Construction Phase of Mass House Building Projects (2008)Model for Predicting the Perf…Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects (2006)Parallel Genetic Algorithms f…Optimization model for resource assignment problems of linear construction projects (2006)Optimization model for resour…The theory of decision making. (1954)Judgment Under Uncertainty: Heuristics and Biases. (1984)Individual differences in reasoning: Implications for the rationality debate? (2000)Heuristics and Biases: The Psychology of Intuitive Judgment (2004)Best-worst multi-criteria decision-making method (2014)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization (2004)Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems (2017)Performance analysis of simulation-based optimization of construction projects using High Performance Computing (2018)A many-objective optimization model for construction scheduling (2019)Professional Construction Management (1976)Challenges in Line-of-Balance Scheduling (2002)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Linear Scheduling Method for Highway Construction (1981)Assignment and Allocation Optimization of Partially Multiskilled Workforce (2002)The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)A new algorithm for resource-constrained project scheduling with breadth and depth of skills (2020)Multi-skilling in scheduling problems: A review on models, methods and applications (2020)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)GA optimization model for repetitive projects with soft logic (2011)Metaheuristics for project and construction management – A state-of-the-art review (2011)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)Construction Planning for Linear Projects (1980)Linear Scheduling Model: Development of Controlling Activity Path (1998)Optimizing Resource Utilization for Repetitive Construction Projects (2001)Schedule control model for linear projects based on linear scheduling method and constraint programming (2013)Scheduling Optimization of Linear Schedule with Constraint Programming (2017)Simulation Modeling and Analysis. (1983)Formal aspects of model validity and validation in system dynamics (1996)The Tacit Dimension (2001)Causes of delay in large construction projects (2006)Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China (2018)Risk Level Evaluation on Construction Project Lifecycle Using Fuzzy Comprehensive Evaluation and TOPSIS (2018)Critical-path planning and scheduling (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)A review of methods and algorithms for optimizing construction scheduling (2013)
this work references cited by second hop

References

  • 1986Decision analysis and behavioral research3,035 cited
  • 2005Time-Cost-Quality Trade-Off Analysis for Highway Construction361 cited
  • 1998Scheduling Projects with Repeating Activities309 cited

Cited by

  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 2012Optimizing linear project scheduling with multi-skilled crews103 cited
  • 2018Schedule risk analysis of infrastructure projects: A hybrid dynamic approach88 cited
  • 2006Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects83 cited
  • 2006Optimization model for resource assignment problems of linear construction projects82 cited
  • 2024An expert system for highway construction: Multi-objective optimization using enhanced particle swarm for optimal equipment management76 cited
  • 2020Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods71 cited
  • 2017Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects69 cited
  • 2016Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic64 cited
  • 2019Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

63 cited
  • 2008Model for Predicting the Performance of Project Managers at the Construction Phase of Mass House Building Projects61 cited
  • 2014Multi-objective genetic optimization for scheduling a multi-storey building56 cited
  • 2021Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm54 cited
  • 2016Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions54 cited
  • 2019Multi-objective optimization for repetitive scheduling under uncertainty54 cited
  • 2023Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects53 cited