Resource-constrained scheduling for continuous repetitive projects with time-based production units
16 references·2 citing·25 second hop
Resource-constrained scheduling for continuous repetitive projects with time-based production units (2009)Resource-constrained scheduling for conti…Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Multiobjective Linear Program…Evolutionary resource scheduler for linear projects (2007)Evolutionary resource schedul…Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Optimal Planning and Scheduling for Repetitive Construction Projects (2005)Optimal Planning and Scheduli…Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)Optimal Repetitive Scheduling…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM) (2001)Comparison of Linear Scheduli…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Linear Scheduling Model: Development of Controlling Activity Path (1998)Linear Scheduling Model: Deve…Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling/Cost Optimization …RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Extensions to Linear Scheduling Optimization (1988)Extensions to Linear Scheduli…Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Construction Planning for Linear Projects (1980)Construction Planning for Lin…Planning Construction of Repetitive Building Units (1974)Planning Construction of Repe…Simultaneous multi-criteria optimization for scheduling linear infrastructure projects (2018)Simultaneous multi-criteria o…Resource Leveling Based on Line of Balance and Constraint Programming (2018)Resource Leveling Based on Li…Professional Construction Management (1976)Challenges in Line-of-Balance Scheduling (2002)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Decision analysis and behavioral research (1986)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Optimizing linear project scheduling with multi-skilled crews (2012)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Line‐of‐Balance Scheduling in Pavement Construction (1986)Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)Construction Resource Scheduling with Genetic Algorithms (1996)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Application of Linear Scheduling (1986)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)A review of methods and algorithms for optimizing construction scheduling (2013)A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units (2015)Optimizing Resource Utilization for Repetitive Construction Projects (2001)
this work references cited by second hop

References

  • 1998Scheduling Projects with Repeating Activities309 cited
  • 1997Scheduling/Cost Optimization and Neural Dynamics Model for Construction224 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1998Linear Scheduling Model: Development of Controlling Activity Path168 cited
  • 2005Optimal Planning and Scheduling for Repetitive Construction Projects166 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 2007Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects108 cited
  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 1988Extensions to Linear Scheduling Optimization101 cited
  • 1974Planning Construction of Repetitive Building Units101 cited
  • 2007Evolutionary resource scheduler for linear projects91 cited
  • 2001Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)89 cited
  • 2001

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Optimal Repetitive Scheduling Model with Shareable Resource Constraint
86 cited

Cited by

  • 2018Resource Leveling Based on Line of Balance and Constraint Programming34 cited
  • 2018Simultaneous multi-criteria optimization for scheduling linear infrastructure projects34 cited