SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A risk engineering approach to project risk management
4 references·2 citing·24 second hop
A risk engineering approach to project risk management (1990)A risk engineering approach to project ri…Risk Analysis for Large Projects: Models, Methods and Cases (1987)Risk Analysis for Large Proje…On The Method of Discrete Probability Distributions in Risk and Reliability Calculations–Application to Seismic Risk Assessment (1981)On The Method of Discrete Pro…MONTE CARLO METHODS AND THE PERT PROBLEM (1963)MONTE CARLO METHODS AND THE P…Letter to the Editor—Monte Carlo Methods and the PERT Problem (1963)Letter to the Editor—Monte Ca…Selection of risk response actions with consideration of secondary risks (2017)Selection of risk response ac…An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry (2007)An evaluation of the impact o…Risk and risk management in construction: a review and future directions for research (1998)A proposal for construction project risk assessment using fuzzy logic (2000)Risk analysis in fixed-price design–build construction projects (2003)A Fuzzy-bayesian Model for Risk Assessment in Power Plant Projects (2016)Application of a Technique for Research and Development Program Evaluation (1959)Distribution of the Time Through a Directed, Acyclic Network (1965)Bounding the Project Completion Time Distribution in PERT Networks (1985)Sample-path optimization of convex stochastic performance functions (1996)On The Quantitative Definition of Risk (1981)The Repeatability of Uncertainty and Sensitivity Analyses for Complex Probabilistic Risk Assessments (1991)Representation and problem solving with Distribution Envelope Determination (DEnv) (2004)Sensitivity in risk analyses with uncertain numbers. (2006)Critical-Path Planning and Scheduling (1959)An Analytical Study of the PERT Assumptions (1964)Markov and Markov-Regenerative pert Networks (1986)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)A guide to the project management body of knowledge (PMBOK guide) (2004)Project scheduling under uncertainty: Survey and research potentials (2004)Applying social network analysis to genetic algorithm in optimizing project risk response decisions (2019)Improved simulated annealing based risk interaction network model for project risk response decisions (2019)Selecting Appropriate Risk Response Strategies Considering Utility Function and Budget Constraints: A Case Study of a Construction Company in Iran (2022)Perceptions of Conflict and Success in Information Systems Development Projects (1993)Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project (1999)A redefinition of the project risk process: Using vulnerability to open up the event-consequence link (2007)
this work references cited by second hop

References

  • 1963Letter to the Editor—Monte Carlo Methods and the PERT Problem268 cited
  • 1963MONTE CARLO METHODS AND THE PERT PROBLEM240 cited
  • 1987Risk Analysis for Large Projects: Models, Methods and Cases136 cited
  • 1981On The Method of Discrete Probability Distributions in Risk and Reliability Calculations–Application to Seismic Risk Assessment122 cited

Cited by

  • 2007An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry54 cited
  • 2017Selection of risk response actions with consideration of secondary risks48 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work