SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Assessing the New United Kingdom Protocol for Dealing with Delay and Disruption
10 references·2 citing·39 second hop
Assessing the New United Kingdom Protocol for Dealing with Delay and Disruption (2003)Assessing the New United Kingdom Protocol…Innovations to Manage Disputes: DRB and NEC (2000)Innovations to Manage Dispute…Generic Methodology for Analyzing Delay Claims (1999)Generic Methodology for Analy…Factors of Non-Excusable Delays That Influence Contractors' Performance (1998)Factors of Non-Excusable Dela…Comparison of Delay Analysis Methodologies (1998)Comparison of Delay Analysis …Claims for extensions of time in civil engineering projects (1998)Claims for extensions of time…A methodology for assessing construction project delays (1998)A methodology for assessing c…Construction Contract Claims (1993)Construction Contract Claims“Claimsmanship”: Current Perspective (1993)“Claimsmanship”: Current Pers…Who Owns Float? (1990)Who Owns Float?Concurrent Delays in Construction Projects (1987)Concurrent Delays in Construc…Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach (2022)Identification and assessment…An investigation into the use of construction delay and disruption analysis methodologies (2008)An investigation into the use…Construction Contracts: Law and Management (1990)Keating on Building Contracts (1991)Taxonomy for change causes and effects in construction projects (2008)Significant Causes and Effects of Variation Orders in Construction Projects (2014)Climate and construction delays: case study in Chile (2015)Construction Scheduling: Preparation, Liability, and Claims (1991)Record keeping for contemporaneous delay analysis: a model for effective event management (2006)Collaborative incentive contracts: stimulating competitive behaviour without competition (2014)Critical path methods in construction practice (1970)The effects of construction delays on project delivery in Nigerian construction industry (2002)Construction Delays and Their Causative Factors in Nigeria (2006)Analyzing delay causes in Egyptian construction projects (2013)Total Construction Project Management (1993)Prediction of outcome of construction dispute claims using multilayer perceptron neural network model (2015)Measuring Project Management Performance: Case of Construction Industry (2017)Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol (2018)Causes of High Costs of Construction in Nigeria (1988)Total Quality Management: The Route to Improving Performance (1993)Causes of Delay in Large Building Construction Projects (1995)Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey (2012)Professional Construction Management (1976)Precedence and Arrow Networking Techniques for Construction (1980)Construction Project Scheduling (1991)Process Model for Administrating Construction Claims (2002)Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs (2013)How to allocate risks in construction contracts (1983)RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. (1985)A comparison of the clarity of traditional construction contracts and of the New Engineering Contract (1997)DISPUTE RESOLUTION AIDED TOOL FOR CONSTRUCTION PROJECTS IN EGYPT / GINČŲ SPRENDIMO PAGALBOS PRIEMONĖ STATYBOS PROJEKTAMS EGIPTE (2011)A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine (2018)Litigation in Construction Contracts: Literature Review (2019)A systemic view of dispute causation (2010)Subcontracting and competitive bidding on incomplete procurement contracts (2014)An ontology-based approach for delay analysis in construction (2017)Reasons for Cost and Schedule Increase for Engineering Design Projects (2002)Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)Exploring delay causes of road construction projects in Egypt (2016)FLORA: New Forensic Schedule Analysis Technique (2008)Float Allocation Using the Total Risk Approach (2009)
this work references cited by second hop

References

  • 1998Factors of Non-Excusable Delays That Influence Contractors' Performance170 cited
  • 1987Concurrent Delays in Construction Projects141 cited
  • 1998Comparison of Delay Analysis Methodologies122 cited
  • 1999Generic Methodology for Analyzing Delay Claims109 cited
  • 1998A methodology for assessing construction project delays98 cited
  • 1998Claims for extensions of time in civil engineering projects90 cited
  • 2000Innovations to Manage Disputes: DRB and NEC54 cited
  • 1993Construction Contract Claims44 cited
  • 1993“Claimsmanship”: Current Perspective43 cited
  • 1990Who Owns Float?37 cited

Cited by

  • 2008An investigation into the use of construction delay and disruption analysis methodologies29 cited
  • 2022Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach27 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work