Simple normal approximation to the completion time distribution for a PERT network
4 references·0 citing·16 second hop
Simple normal approximation to the completion time distribution for a PERT network (1995)Simple normal approximation to the comple…Normally Distributed Activity Durations in PERT Networks (1985)Normally Distributed Activity…Bounding the Project Completion Time Distribution in PERT Networks (1985)Bounding the Project Completi…The Completion Time of PERT Networks (1983)The Completion Time of PERT N…Bounding Distributions for a Stochastic Acyclic Network (1971)Bounding Distributions for a …Application of a Technique for Research and Development Program Evaluation (1959)Expected Critical Path Lengths in PERT Networks (1962)An upper bound on the expected completion time of PERT networks (1985)Critical path in an activity network with time constraints (1997)A new approximation algorithm for obtaining the probability distribution function for project completion time (2007)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)Bounding distributions for a stochastic pert network (1977)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)On criticality and sensitivity in activity networks (2000)Letter to the Editor—Monte Carlo Methods and the PERT Problem (1963)Activity networks: Project planning and control by network models (1977)Computational complexity of PERT problems (1988)Modeling impacts of process architecture on cost and schedule risk in product development (2002)The Most Critical Path in a PERT Network (1994)A study of approximating the moments of the job completion time in PERT networks (1996)
this work references cited by second hop

References

  • 1985Bounding the Project Completion Time Distribution in PERT Networks179 cited
  • 1971Bounding Distributions for a Stochastic Acyclic Network132 cited
  • 1983The Completion Time of PERT Networks68 cited
  • 1985Normally Distributed Activity Durations in PERT Networks39 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work