SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Development and On-Site Evaluation of an Automated Materials Management and Control Model
5 references·1 citing·25 second hop
Development and On-Site Evaluation of an Automated Materials Management and Control Model (2005)Development and On-Site Evaluation of an …Project management in construction (2007)Project management in constru…Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement (2003)Internet-Based Geographical I…Role of the Fabricator in Labor Productivity (2000)Role of the Fabricator in Lab…Improving the materials supply system in small-sized building firms (1999)Improving the materials suppl…Costs and Benefits of Materials Management Systems (1987)Costs and Benefits of Materia…Application areas and antecedents of automation in logistics and supply chain management: a conceptual framework (2021)Application areas and anteced…Impact of Electronic Data Interchange Technology on JIT Shipments (1994)Electronic Data Interchange: Competitive Externalities and Strategic Implementation Policies (1995)Characteristics of electronic markets (1997)A GIS approach to shopping mall location selection (2005)Integrated Supplier Selection Framework in a Resilient Construction Supply Chain: An Approach via Analytic Hierarchy Process (AHP) and Grey Relational Analysis (GRA) (2017)Contribution of small and medium enterprises to economic development and quality of life in Turkey (2020)The Manufacturing Advantage: Achieving Competitive Manufacturing Operations (1992)AN INTEGRATED FUZZY MCGDM APPROACH FOR SUPPLIER SELECTION PROBLEM (2017)Value Engineering for Defect Prevention on Building Façade (2018)Critical factors for total quality management implementation in the Brazilian construction industry (2020)Quantitative Effects of Construction Changes on Labor Productivity (1995)Construction Baseline Productivity: Theory and Practice (1999)Loss of Labor Productivity due to Delivery Methods and Weather (1999)Fundamental Principles of Workforce Management (2005)Conceptual framework of construction productivity estimation (2006)Optimal Productivity in Labor-Intensive Construction Operations: Pilot Study (2016)A Coefficient of Agreement for Nominal Scales (1960)The Measurement of Observer Agreement for Categorical Data (1977)Humans and Automation: Use, Misuse, Disuse, Abuse (1997)Constructability and Constructability Programs: White Paper (1991)Critical Communications Variables (1998)A comparative evaluation of construction and manufacturing materials management (2002)Selecting a suitable procurement method for a building project (1998)Delay Mitigation in the Malaysian Construction Industry (2006)Future criteria for success of building projects in Malaysia (2010)
this work references cited by second hop

References

  • 2007Project management in construction364 cited
  • 1987Costs and Benefits of Materials Management Systems90 cited
  • 2000Role of the Fabricator in Labor Productivity83 cited
  • 2003Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement48 cited
  • 1999Improving the materials supply system in small-sized building firms36 cited

Cited by

  • 2021Application areas and antecedents of automation in logistics and supply chain management: a conceptual framework41 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work