Heuristic method for multi‐project finance‐based scheduling
6 references·15 citing·38 second hop
Heuristic method for multi‐project finance‐based scheduling (2009)Heuristic method for multi‐project financ…Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…Maximizing the net present value of a project subject to materials and capital constraints (1987)Maximizing the net present va…A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions (1986)A Comparison of Heuristics fo…Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (1977)Scheduling a Project to Maxim…Cash Flows in Networks (1970)Cash Flows in NetworksTime-cost trade-off optimization model for retrofitting planning projects using MOGA (2024)Time-cost trade-off optimizat…Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects (2023)Discrete OBNSGA III method-ba…AHP and NSGA-II-Based Time–Cost–Quality Trade-Off Optimization Model for Construction Projects (2021)AHP and NSGA-II-Based Time–Co…Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms (2020)Finance-based scheduling mult…Finance-based scheduling: optimization of results-based funded multiple projects (2019)Finance-based scheduling: opt…A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects (2019)A qualitative framework for s…Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)Optimizing Financing Cost in …Financial issues in construction companies: bibliometric analysis and trends (2018)Financial issues in construct…Generic Scheduling Optimization Model for Multiple Construction Projects (2017)Generic Scheduling Optimizati…Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm (2017)Gas and oil project time-cost…Team based labour assignment methodology for new product development projects (2016)Team based labour assignment …MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm (2016)MOSCOPEA: Multi-objective con…Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio (2011)Multiobjective evolutionary f…Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio (2010)Multiobjective Evolutionary F…Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities (2009)Finance‐based CPM/LOB schedul…The discrete time-cost tradeoff problem revisited (1995)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow (2010)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project network models with discounted cash flows a guided tour through recent developments (1997)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Dynamic Version of the Economic Lot Size Model (1958)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)The development of cash flow weight procedures for maximizing the net present value of a project (1996)Activity Delay in Stochastic Project Networks (1997)Integrated project scheduling and material planning with variable activity duration and rewards (2001)Dynamic Version of the Economic Lot Size Model (2004)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)The scheduling of activities to maximize the net present value of projects (1990)Analysis of the characteristics of projects in diverse industries (1998)Using metaheuristics in multiobjective resource constrained project scheduling (2000)A genetic algorithm for the resource constrained multi-project scheduling problem (2007)Time-cost tradeoff analysis with minimized project financing cost (2018)Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders (1989)Business failures in the construction industry (2000)Prediction Liquidated Damages via Ensemble Machine Learning Model: Towards Sustainable Highway Construction Projects (2022)Critical-path planning and scheduling (1959)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects (2024)NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects (2024)MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-QUALITY USING MULTI-COLONY ANT ALGORITHM (2007)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach (2024)Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development (2024)Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (1990)Hierarchical models for multi-project planning and scheduling (1993)
this work references cited by second hop

References

  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 1970Cash Flows in Networks230 cited
  • 1977Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach147 cited
  • 1986A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions135 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 1987Maximizing the net present value of a project subject to materials and capital constraints78 cited

Cited by

  • 2018Optimizing Financing Cost in Construction Projects with Fixed Project Duration63 cited
  • 2021AHP and NSGA-II-Based Time–Cost–Quality Trade-Off Optimization Model for Construction Projects59 cited
  • 2017Generic Scheduling Optimization Model for Multiple Construction Projects59 cited
  • 2024Time-cost trade-off optimization model for retrofitting planning projects using MOGA58 cited
  • 2023Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects52 cited
  • 2016MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm52 cited
  • 2019A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects51 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2009
Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities
50 cited
  • 2020Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms49 cited
  • 2017Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm40 cited
  • 2011Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio40 cited
  • 2010Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio39 cited
  • 2018Financial issues in construction companies: bibliometric analysis and trends26 cited
  • 2016Team based labour assignment methodology for new product development projects10 cited
  • 2019Finance-based scheduling: optimization of results-based funded multiple projects1 cited