An upper bound on the expected completion time of PERT networks
7 references·9 citing·27 second hop
An upper bound on the expected completion time of PERT networks (1985)An upper bound on the expected completion…The Completion Time of PERT Networks (1983)The Completion Time of PERT N…Inequalities for the Completion Times of Stochastic PERT Networks (1979)Inequalities for the Completi…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…Bounding Distributions for a Stochastic Acyclic Network (1971)Bounding Distributions for a …On the Expected Duration of PERT Type Networks (1967)On the Expected Duration of P…A Statistical Theory for PERT Critical Path Analysis (1966)A Statistical Theory for PERT…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…How Robust Is Your Project? From Local Failures to Global Catastrophes: A Complex Networks Approach to Project Systemic Risk (2015)How Robust Is Your Project? F…Sourcing decisions of project tasks with exponential completion times: Impact on operating profits (2011)Sourcing decisions of project…Evaluating project completion times when activity times are Weibull distributed (2003)Evaluating project completion…Finding the critical path in an activity network with time-switch constraints (2000)Finding the critical path in …A study of approximating the moments of the job completion time in PERT networks (1996)A study of approximating the …Bounds on Expected Project Tardiness (1995)Bounds on Expected Project Ta…Estimating the mean completion time of PERT networks with exponentially distributed durations of activities (1993)Estimating the mean completio…THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE (1989)THE ESTIMATION OF SOME NETWOR…Normally Distributed Activity Durations in PERT Networks (1985)Normally Distributed Activity…Expected Critical Path Lengths in PERT Networks (1962)Critical path in an activity network with time constraints (1997)Improving project cost estimation by taking into account managerial flexibility (2000)A new approximation algorithm for obtaining the probability distribution function for project completion time (2007)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)Bounding distributions for a stochastic pert network (1977)An Analytical Study of the PERT Assumptions (1964)A Multivariate Approach to Estimating the Completion Time for PERT Networks (1986)Markov and Markov-Regenerative pert Networks (1986)The Asymptotic Theory of Extreme Order Statistics (1990)On criticality and sensitivity in activity networks (2000)Making-Sense of the Impact and Importance of Outliers in Project Management through the Use of Power Laws (2013)Project Risk time Management – A Proposed Model and a Case Study in the Construction Industry (2015)Critical Path Analyses Via Chance Constrained and Stochastic Programming (1964)Stochastic and Fuzzy Pert (1997)Simplified Program Evaluation and Review Technique (PERT) (1999)Critical-path planning and scheduling (1959)Combined Queueing and Activity Network Based Modeling of Sojourn Time Distributions in Distributed Telecommunication Systems (1994)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Critical-Path Planning and Scheduling: Mathematical Basis (1961)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)The Most Critical Path in a PERT Network (1994)Simple normal approximation to the completion time distribution for a PERT network (1995)Project scheduling problem with stochastic activity duration times (2004)
this work references cited by second hop

References

  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1977Activity networks: Project planning and control by network models575 cited
  • 1971Bounding Distributions for a Stochastic Acyclic Network132 cited
  • 1967On the Expected Duration of PERT Type Networks100 cited
  • 1966A Statistical Theory for PERT Critical Path Analysis92 cited
  • 1983The Completion Time of PERT Networks68 cited
  • 1979Inequalities for the Completion Times of Stochastic PERT Networks59 cited

Cited by

  • 2003Evaluating project completion times when activity times are Weibull distributed42 cited
  • 1985Normally Distributed Activity Durations in PERT Networks39 cited
  • 1989THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE39 cited
  • 2015How Robust Is Your Project? From Local Failures to Global Catastrophes: A Complex Networks Approach to Project Systemic Risk36 cited
  • 1995Bounds on Expected Project Tardiness34 cited
  • 2000Finding the critical path in an activity network with time-switch constraints34 cited
  • 1993Estimating the mean completion time of PERT networks with exponentially distributed durations of activities31 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

1996
A study of approximating the moments of the job completion time in PERT networks
29 cited
  • 2011Sourcing decisions of project tasks with exponential completion times: Impact on operating profits11 cited