Artificial intelligence approaches to achieve strategic control over project cash flows
9 references·9 citing·44 second hop
Artificial intelligence approaches to achieve strategic control over project cash flows (2008)Artificial intelligence approaches to ach…The utility of cash flow forecasts in the management of corporate cash balances (2006)The utility of cash flow fore…Cash Flow Forecasting Model for General Contractors Using Moving Weights of Cost Categories (2005)Cash Flow Forecasting Model f…A tool for managing projects: an analytic parameterization of the S-curve (2004)A tool for managing projects:…Probabilistic Monitoring of Project Performance Using SS-Curves (2000)Probabilistic Monitoring of P…A neural networks approach for cost flow forecasting (1998)A neural networks approach fo…Fuzzy sets (1996)Fuzzy setsCompany-Level Cash-Flow Management (1996)Company-Level Cash-Flow Manag…Contractor Failure: Analysis (1991)Contractor Failure: AnalysisFuzzy sets (1965)Fuzzy setsEstimation at Completion in Civil Engineering Projects: Review of Regression and Soft Computing Models (2021)Estimation at Completion in C…Application of Artificial Neural Networks in Construction Management: Current Status and Future Directions (2021)Application of Artificial Neu…Novel Approach to Estimating Schedule to Completion in Construction Projects Using Sequence and Nonsequence Learning (2019)Novel Approach to Estimating …CONTRACTOR COSTS OF FACTORING ACCOUNT RECEIVABLES FOR A CONSTRUCTION PROJECT / RANGOVO SĄNAUDOS, STATYBŲ PROJEKTO GAUTINAS SUMAS PERDAVUS FAKTORINGO ĮMONEI (2012)CONTRACTOR COSTS OF FACTORING…Evolutionary fuzzy hybrid neural network for dynamic project success assessment in construction industry (2011)Evolutionary fuzzy hybrid neu…A survey of AI in operations management from 2005 to 2009 (2011)A survey of AI in operations …A novel time-depended evolutionary fuzzy SVM inference model for estimating construction project at completion (2011)A novel time-depended evoluti…Evaluating subcontractor performance using evolutionary fuzzy hybrid neural network (2010)Evaluating subcontractor perf…An empirical examination of project contractors' supply-chain cash flow performance and owners' payment patterns (2010)An empirical examination of p…The use of artificial neural networks in construction management: a review (1996)Applying fuzzy techniques to cash flow analysis (1999)An evaluation of risk factors impacting construction cash flow forecast (2008)Measuring Project Management Performance: Case of Construction Industry (2017)Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders (1989)Project Management for Engineering and Construction (1993)Evolutionary fuzzy decision model for cash flow prediction using time-dependent support vector machines (2010)Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow (2010)Multiple Linear Regression Model for Improved Project Cost Forecasting (2022)Business Failure in Construction Industry (1988)Decision Criteria in Contractor Prequalification (1988)Applying cluster analysis to construction contractor classification (1996)Generic Scheduling Optimization Model for Multiple Construction Projects (2017)Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)I.—The Mathematical Theory of Banking (1888)The Transactions Demand for Cash: An Inventory Theoretic Approach (1952)A Model of the Demand for Money by Firms (1966)Stochastic Cash Flow Management Models: A Literature Review Since the 1980s (2015)A multi-objective approach to the cash management problem (2016)Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry (2016)Cost Planning of Buildings (1970)Resource-based model for automatic cash-flow forecasting (1995)MANAGING TARGET THE CASH BALANCE IN CONSTRUCTION FIRMS USING A FUZZY REGRESSION APPROACH (2009)From Being to Becoming: Time and Complexity in the Physical Sciences (1982)From Being to Becoming: Time and Complexity in the Physical Sciences (1982)Project management — A managerial approach (1989)An Earned Schedule-based regression model to improve cost estimate at completion (2014)Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost (2015)Earned Green Value management for project management: A systematic review (2019)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Delays in construction projects: The case of Jordan (2007)Analysing factors affecting delays in Indian construction projects (2011)Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)Explainable machine learning for project management control (2023)Using Machine Learning to Improve Cost and Duration Prediction Accuracy in Green Building Projects (2023)Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution (2009)Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method (2010)A comparative study of Artificial Intelligence methods for project duration forecasting (2015)Extensions of the TOPSIS for group decision-making under fuzzy environment (2000)An approach for detecting, quantifying, and visualizing the evolution of a research field: A practical application to the Fuzzy Sets Theory field (2010)Science mapping software tools: Review, analysis, and cooperative study among tools (2011)Family resemblances: Studies in the internal structure of categories (1975)Basic objects in natural categories (1976)Soft set theory—First results (1999)
this work references cited by second hop

References

  • 1965Fuzzy sets67,827 cited
  • 1996Fuzzy sets46,880 cited
  • 2005Cash Flow Forecasting Model for General Contractors Using Moving Weights of Cost Categories115 cited
  • 2000Probabilistic Monitoring of Project Performance Using SS-Curves106 cited
  • 1998A neural networks approach for cost flow forecasting95 cited
  • 2004A tool for managing projects: an analytic parameterization of the S-curve79 cited
  • 1991Contractor Failure: Analysis76 cited
  • 1996Company-Level Cash-Flow Management75 cited
  • 2006The utility of cash flow forecasts in the management of corporate cash balances55 cited

Cited by

  • 2019Novel Approach to Estimating Schedule to Completion in Construction Projects Using Sequence and Nonsequence Learning65 cited
  • 2011A novel time-depended evolutionary fuzzy SVM inference model for estimating construction project at completion51 cited
  • 2011A survey of AI in operations management from 2005 to 200941 cited
  • 2021Estimation at Completion in Civil Engineering Projects: Review of Regression and Soft Computing Models39 cited
  • 2011Evolutionary fuzzy hybrid neural network for dynamic project success assessment in construction industry37 cited
  • 2010

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Evaluating subcontractor performance using evolutionary fuzzy hybrid neural network
36 cited
  • 2021Application of Artificial Neural Networks in Construction Management: Current Status and Future Directions35 cited
  • 2010An empirical examination of project contractors' supply-chain cash flow performance and owners' payment patterns32 cited
  • 2012CONTRACTOR COSTS OF FACTORING ACCOUNT RECEIVABLES FOR A CONSTRUCTION PROJECT / RANGOVO SĄNAUDOS, STATYBŲ PROJEKTO GAUTINAS SUMAS PERDAVUS FAKTORINGO ĮMONEI17 cited