Cost‐ and Schedule‐Control Integration: Issues and Needs
2 references·6 citing·25 second hop
Cost‐ and Schedule‐Control Integration: Issues and Needs (1991)Cost‐ and Schedule‐Control Integration: I…Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders (1989)Project Management for Constr…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects (2015)Assessing Understanding of Pl…Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control (2006)Knowledge-Based Standard Prog…Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration (2002)Multiple Simulation Analysis …Assessment of cost control systems: a case study of Thai construction organizations (2001)Assessment of cost control sy…Resource-based model for automatic cash-flow forecasting (1995)Resource-based model for auto…Cost, Schedule, and Time Variances and Integration (1993)Cost, Schedule, and Time Vari…Project management: A systems approach to planning, scheduling and controlling (1982)Project management : a systems approach to planning, scheduling, and controlling (1995)Likert scales: how to (ab)use them (2004)Qualitative Evaluation Methods (1981)Meaning in Method: The Rhetoric of Quantitative and Qualitative Research (1987)Applications of case study research (1993)Modern construction management (1990)Company-Level Cash-Flow Management (1996)Financing Construction: Cash Flows and Cash Farming (2003)Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions (2005)GA-based multi-objective optimization of finance-based construction project scheduling (2010)Modern Construction Management (2012)Earned value in project management (2003)Flexible Work Breakdown Structure for Integrated Cost and Schedule Control (2004)Theorizing about Standardization: Integrating Fragments of Process Theory in Light of Telecommunication Standardization Wars (2008)PCIM: Project Control and Inhibiting-Factors Management Model (2012)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Web‐based integrated project control system (2004)Float Consumption Impact on Cost and Schedule in the Construction Industry (2007)Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Risk management in oil and gas construction projects in Vietnam (2007)Root-Cause Analysis of Construction-Cost Overruns (2013)Determining Critical Success Factors of Project Management Practice: A Conceptual Framework (2014)
this work references cited by second hop

References

  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1989Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders349 cited

Cited by

  • 1995Resource-based model for automatic cash-flow forecasting59 cited
  • 2002Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration57 cited
  • 2006Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control55 cited
  • 1993Cost, Schedule, and Time Variances and Integration49 cited
  • 2015Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects37 cited
  • 2001Assessment of cost control systems: a case study of Thai construction organizations36 cited