Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows
9 references·8 citing·36 second hop
Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows (1997)Scheduling projects to maximize net prese…A Simulated Annealing Approach to the Network Design Problem with Variational Inequality Constraints (1992)A Simulated Annealing Approac…Constructing School Timetables Using Simulated Annealing: Sequential and Parallel Algorithms (1991)Constructing School Timetable…The scheduling of activities to maximize the net present value of projects (1990)The scheduling of activities …USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)USING A LATE‐START RESOURCE‐C…A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions (1986)A Comparison of Heuristics fo…Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (1977)Scheduling a Project to Maxim…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…The payment scheduling problem (1972)The payment scheduling problemCash Flows in Networks (1970)Cash Flows in NetworksManaging Project Performance Risks under Uncertainty: Using a Dynamic Capital Structure Approach in Infrastructure Project Financing (2017)Managing Project Performance …Research and Teaching Opportunities in Project Management (2016)Research and Teaching Opportu…Optimizing version release dates of research and development long-term processes (2016)Optimizing version release da…Optimised scheduling for weather sensitive offshore construction projects (2016)Optimised scheduling for weat…Resource constrained project scheduling problem with discounted earliness–tardiness penalties: Mathematical modeling and solving procedure (2013)Resource constrained project …Metaheuristics for multi-mode capital-constrained project payment scheduling (2012)Metaheuristics for multi-mode…Assessing Uncertainty and Risk in Public Sector Investment Projects (2011)Assessing Uncertainty and Ris…Progress payments in project scheduling problems (2003)Progress payments in project …A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Manufacturing Planning and Control Systems (1984)A heuristic scheduling algorithm for improving the duration and net present value of a project (1995)The development of cash flow weight procedures for maximizing the net present value of a project (1996)Activity Delay in Stochastic Project Networks (1997)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project network models with discounted cash flows a guided tour through recent developments (1997)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)An efficient approach to solving the road network equilibrium traffic assignment problem (1975)The existence, uniqueness and stability of traffic equilibria (1979)Traffic Equilibrium and Variational Inequalities (1980)Genetic-Algorithms-Based Approach for Bilevel Programming Models (2000)An equivalent continuously differentiable model and a locally convergent algorithm for the continuous network design problem (2001)Global optimization method for mixed transportation network design problem: A mixed-integer linear programming approach (2011)Management Guide to PERT/CPM (1969)Work Continuity Constraints in Project Scheduling (2005)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Analysis of the characteristics of projects in diverse industries (1998)Using metaheuristics in multiobjective resource constrained project scheduling (2000)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A decision support framework for estimating project duration under the impact of weather (2018)A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem (2021)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)An integrated survey of deterministic project scheduling (2001)Optimization Models for the Scheduling of Testing Tasks in New Product Development (1996)Project Contracts and Payment Schedules: The Client's Problem (2001)A review of the contribution of Operational Research to Project Management (2002)Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (1990)Hierarchical models for multi-project planning and scheduling (1993)Applying simulated annealing to location-planning models (1996)Recent developments in practical course timetabling (1998)A harmony search algorithm for university course timetabling (2010)
this work references cited by second hop

References

  • 1977Activity networks: Project planning and control by network models575 cited
  • 1991Constructing School Timetables Using Simulated Annealing: Sequential and Parallel Algorithms290 cited
  • 1992A Simulated Annealing Approach to the Network Design Problem with Variational Inequality Constraints285 cited
  • 1970Cash Flows in Networks230 cited
  • 1977Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach147 cited
  • 1986A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions135 cited
  • 1990The scheduling of activities to maximize the net present value of projects124 cited
  • 1972The payment scheduling problem119 cited
  • 1987USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE*74 cited

Cited by

  • 2016Optimised scheduling for weather sensitive offshore construction projects58 cited
  • 2013Resource constrained project scheduling problem with discounted earliness–tardiness penalties: Mathematical modeling and solving procedure43 cited
  • 2003Progress payments in project scheduling problems42 cited
  • 2011Assessing Uncertainty and Risk in Public Sector Investment Projects35 cited
  • 2017Managing Project Performance Risks under Uncertainty: Using a Dynamic Capital Structure Approach in Infrastructure Project Financing

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

31 cited
  • 2016Research and Teaching Opportunities in Project Management31 cited
  • 2012Metaheuristics for multi-mode capital-constrained project payment scheduling31 cited
  • 2016Optimizing version release dates of research and development long-term processes14 cited