ABSTRACT Although literature on the achievement of monetary objectives in a resource‐constrained project environment is limited, the maximization of project net present value (NPV) is an important criterion of project success. This paper presents a procedure for developing a late‐start resource‐constrained project schedule using the critical path method‐material requirements planning. Using an extensive set of problems from the literature, we show that this procedure yields a higher NPV and lower average duration than schedules derived with heuristics that schedule each activity as early as possible. In addition, while the late‐start schedule on average was significantly longer than the optimal‐duration resource‐constrained schedule, no significant difference occurred in the average NPVs of the two scheduling methods.
Loading…
Stored only when both papers are in the corpus — 74 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.