SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE*
12 references·16 citing·35 second hop
USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)USING A LATE‐START RESOURCE‐CONSTRAINED P…A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions (1986)A Comparison of Heuristics fo…Manufacturing Planning and Control Systems (1984)Manufacturing Planning and Co…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning (1980)A formal set of algorithms fo…Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (1977)Scheduling a Project to Maxim…Project scheduling: The effects of problem structure on heuristic performance (1976)Project scheduling: The effec…Project Network Summary Measures Constrained- Resource Scheduling (1975)Project Network Summary Measu…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…The payment scheduling problem (1972)The payment scheduling problemCash Flows in Networks (1970)Cash Flows in NetworksSome Properties of Schedules for Large Projects with Limited Resources (1964)Some Properties of Schedules …An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem (2021)An Immune Genetic Algorithm f…Current status and future potential of the research on Critical Chain Project Management (2015)Current status and future pot…A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows (2014)A new scheduling technique fo…A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (2009)A scatter search heuristic fo…Simulated annealing and tabu search for multi-mode project payment scheduling (2008)Simulated annealing and tabu …A genetic algorithm for resource investment problem with discounted cash flows (2006)A genetic algorithm for resou…Progress payments in project scheduling problems (2003)Progress payments in project …Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds (2001)Maximizing the Net Present Va…Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows (1997)Scheduling projects to maximi…Activity Delay in Stochastic Project Networks (1997)Activity Delay in Stochastic …Using discounted cash flow heuristics to improve project net present valve (1996)Using discounted cash flow he…The development of cash flow weight procedures for maximizing the net present value of a project (1996)The development of cash flow …Heuristic scheduling of capital constrained projects (1996)Heuristic scheduling of capit…A heuristic scheduling algorithm for improving the duration and net present value of a project (1995)A heuristic scheduling algori…Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (1993)Early-tardy cost trade-offs i…Project bidding under deterministic and probabilistic activity durations (1990)Project bidding under determi…An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)Multi-Project Scheduling: Analysis of Project Performance (1985)The trade-off between stability and makespan in resource-constrained project scheduling (2005)Application of a Technique for Research and Development Program Evaluation (1959)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A survey on the resource-constrained project scheduling problem (1995)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project network models with discounted cash flows a guided tour through recent developments (1997)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Management Guide to PERT/CPM (1969)Optimization Models for the Scheduling of Testing Tasks in New Product Development (1996)Project Contracts and Payment Schedules: The Client's Problem (2001)Work Continuity Constraints in Project Scheduling (2005)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Resource-constrained project scheduling by simulated annealing (1996)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Journal of Industrial Engineering (2017)Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)The scheduling of activities to maximize the net present value of projects (1990)Analysis of the characteristics of projects in diverse industries (1998)Using metaheuristics in multiobjective resource constrained project scheduling (2000)CONWIP: a pull alternative to kanban (1990)Models for production planning under uncertainty: A review (2006)The evolution of the intellectual structure of operations management—1980–2006: A citation/co‐citation analysis (2008)Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (1990)Hierarchical models for multi-project planning and scheduling (1993)A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)Critical Chain Project Scheduling: Do Not Oversimplify (2002)Project scheduling with resource constraints: A branch and bound approach (1987)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)
this work references cited by second hop

References

  • 1984Manufacturing Planning and Control Systems1,029 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1970Cash Flows in Networks230 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 1964Some Properties of Schedules for Large Projects with Limited Resources166 cited
  • 1977Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach147 cited
  • 1976Project scheduling: The effects of problem structure on heuristic performance142 cited
  • 1986A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions135 cited
  • 1972The payment scheduling problem119 cited
  • 1975Project Network Summary Measures Constrained- Resource Scheduling87 cited
  • 1980A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning84 cited

Cited by

  • 1997Activity Delay in Stochastic Project Networks66 cited
  • 1997Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

66 cited
  • 1996The development of cash flow weight procedures for maximizing the net present value of a project65 cited
  • 1995A heuristic scheduling algorithm for improving the duration and net present value of a project60 cited
  • 2014A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows57 cited
  • 2009A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows57 cited
  • 2008Simulated annealing and tabu search for multi-mode project payment scheduling56 cited
  • 1993Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach53 cited
  • 2006A genetic algorithm for resource investment problem with discounted cash flows51 cited
  • 2015Current status and future potential of the research on Critical Chain Project Management50 cited
  • 2001Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds49 cited
  • 1996Using discounted cash flow heuristics to improve project net present valve44 cited
  • 1996Heuristic scheduling of capital constrained projects42 cited
  • 2003Progress payments in project scheduling problems42 cited
  • 1990Project bidding under deterministic and probabilistic activity durations42 cited
  • 2021An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem40 cited