Optimization of a highway project planning using a modified genetic algorithm
16 references·0 citing·55 second hop
Optimization of a highway project planning using a modified genetic algorithm (2013)Optimization of a highway project plannin…The Multi-Actor Multi-Criteria Analysis (MAMCA) application in the Flemish long-term decision making process on mobility and logistics (2010)The Multi-Actor Multi-Criteri…Making public transport financially sustainable (2010)Making public transport finan…The uses of cost–benefit analysis in public transportation decision-making in France (2009)The uses of cost–benefit anal…Automated trade‐off between time and cost in planning repetitive construction projects (2009)Automated trade‐off between t…A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…Resource-constrained construction project scheduling model for profit maximization considering cash flow (2008)Resource-constrained construc…Relative measurement and its generalization in decision making why pairwise comparisons are central in mathematics for the measurement of intangible factors the analytic hierarchy/network process (2008)Relative measurement and its …MULTIPLE‐CRITERIA DECISION SUPPORT SYSTEM IN HIGHWAY INFRASTRUCTURE MANAGEMENT (2008)MULTIPLE‐CRITERIA DECISION SU…MULTI‐OBJECTIVE DECISION‐MAKING FOR ROAD DESIGN (2008)MULTI‐OBJECTIVE DECISION‐MAKI…Evolutionary resource scheduler for linear projects (2007)Evolutionary resource schedul…Discrete–continuous project scheduling with discounted cash flows—A tabu search approach (2006)Discrete–continuous project s…A tool for prioritizing multinational transport infrastructure investments (2006)A tool for prioritizing multi…Transportation Cost and Benefit Analysis Techniques, Estimates and Implications (2003)Transportation Cost and Benef…The regional allocation of infrastructure investment: The role of equity, efficiency and political factors (2003)The regional allocation of in…Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows (1997)Scheduling projects to maximi…The development of cash flow weight procedures for maximizing the net present value of a project (1996)The development of cash flow …The Analytic Hierarchy Process (1985)The analytic hierarchy process—what it is and how it is used (1987)Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Reviewing the use of Multi-Criteria Decision Analysis for the evaluation of transport projects: Time for a multi-actor approach (2014)A review of multi-criteria assessment of the social sustainability of infrastructures (2018)State-of-the-art review on multi-criteria decision-making in the transport sector (2020)Case Study Research: Design and Methods (1984)Case Study Research: Design and Methods (1991)Making Cycling Irresistible: Lessons from The Netherlands, Denmark and Germany (2008)Demand for Public Transport in Germany and the USA: An Analysis of Rider Characteristics (2012)Travel trends among young adults in Germany: increasing multimodality and declining car use for men (2012)A review on bike-sharing: The factors affecting bike-sharing demand (2019)Multiple Attribute Decision Making (1981)Multiple Attribute Decision Making: Methods and Applications (1981)A NEW ADDITIVE RATIO ASSESSMENT (ARAS) METHOD IN MULTICRITERIA DECISION‐MAKING / NAUJAS ADITYVINIS KRITERIJŲ SANTYKIŲ ĮVERTINIMO METODAS (ARAS) DAUGIAKRITERINIAMS UŽDAVINIAMS SPRĘSTI (2010)PROJECT MANAGEMENT BY MULTIMOORA AS AN INSTRUMENT FOR TRANSITION ECONOMIES / PROJEKTŲ VADYBA SU MULTIMOORA KAIP PRIEMONĖ PEREINAMOJO LAIKOTARPIO ŪKIAMS (2010)Multiple criteria decision-making techniques and their applications – a review of the literature from 2000 to 2014 (2015)Social Choice and Individual Values. (1951)Social Choice and Individual Values (1952)Procedures for synthesizing ratio judgements (1983)Multi-criteria evaluation model for the selection of sustainable materials for building projects (2012)When is a Decision-Making Method Trustworthy? Criteria for Evaluating Multi-Criteria Decision-Making Methods (2015)A review of fuzzy AHP methods for decision-making with subjective judgements (2020)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling Projects with Repeating Activities (1998)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)GA optimization model for repetitive projects with soft logic (2011)Metaheuristics for project and construction management – A state-of-the-art review (2011)Optimizing linear project scheduling with multi-skilled crews (2012)Principles of accounting (1919)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Some Tests of Specification for Panel Data: Monte Carlo Evidence and an Application to Employment Equations (1991)Initial conditions and moment restrictions in dynamic panel data models (1995)Initial conditions and moment restrictions in dynamic panel data models (1998)Infrastructure investment and Spanish economic growth, 1850–1935 (2006)Distributive Politics Around the World (2011)Who Benefits from Distributive Politics? How the Outcome One Studies Affects the Answer One Gets (2013)Group Decision Making and the AHP (1989)The analytic hierarchy process: applications and studies (1993)WHITE PAPER, European transport policy for 2010 : time to decide (2004)Operations Research for green logistics – An overview of aspects, issues, contributions and challenges (2011)Generalised framework for multi-criteria method selection (2018)A Foundation for the Study of Group Decision Support Systems (1987)Information Technology to Support Electronic Meetings (1988)Quantitative Risk Analysis: A Guide to Monte Carlo Simulation Modelling (1996)Multi actor multi criteria analysis (MAMCA) as a tool to support sustainable decisions: State of use (2012)A new look at planning and designing transportation systems: A decision-making model based on cognitive rationality, stakeholder engagement and quantitative methods (2014)Ranking of Adaptive Reuse Strategies for Abandoned Industrial Heritage in Vulnerable Contexts: A Multiple Criteria Decision Aiding Approach (2019)The Full Costs and Benefits of Transportation (1997)The High Cost of Free Parking (1997)Sustainability and Cities: Overcoming Automobile Dependence (1999)Who owns the roads? How motorised traffic discourages walking and bicycling (2009)A sustainable EOQ model: Theoretical formulation and applications (2013)The Social Cost of Automobility, Cycling and Walking in the European Union (2019)
this work references cited by second hop

References

  • 2008Relative measurement and its generalization in decision making why pairwise comparisons are central in mathematics for the measurement of intangible factors the analytic hierarchy/network process1,115 cited
  • 2008MULTI‐OBJECTIVE DECISION‐MAKING FOR ROAD DESIGN265 cited
  • 2003The regional allocation of infrastructure investment: The role of equity, efficiency and political factors235 cited
  • 2003Transportation Cost and Benefit Analysis Techniques, Estimates and Implications231 cited
  • 2010Making public transport financially sustainable153 cited
  • 2009The uses of cost–benefit analysis in public transportation decision-making in France145 cited
  • 2010The Multi-Actor Multi-Criteria Analysis (MAMCA) application in the Flemish long-term decision making process on mobility and logistics143 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 2008Resource-constrained construction project scheduling model for profit maximization considering cash flow123 cited
  • 2006A tool for prioritizing multinational transport infrastructure investments118 cited
  • 2008MULTIPLE‐CRITERIA DECISION SUPPORT SYSTEM IN HIGHWAY INFRASTRUCTURE MANAGEMENT109 cited
  • 2007Evolutionary resource scheduler for linear projects91 cited
  • 1997Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows66 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 1996The development of cash flow weight procedures for maximizing the net present value of a project65 cited
  • 2006Discrete–continuous project scheduling with discounted cash flows—A tabu search approach57 cited
  • 2009Automated trade‐off between time and cost in planning repetitive construction projects52 cited
  • Cited by

    No citing works inside the corpus for this window.