Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry
8 references·0 citing·30 second hop
Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry (2007)Evaluating guaranteed maximum price and t…Construction Contracting (2018)Construction ContractingThe definition of alliancing in construction as a Wittgenstein family-resemblance concept (2006)The definition of alliancing …An empirical study of the benefits of construction partnering in Hong Kong (2003)An empirical study of the ben…The guaranteed maximum price contract as call option (2001)The guaranteed maximum price …The Research Interview (2000)The Research InterviewTarget cost contracts: an analysis of the interplay between fee, target, share and price (2000)Target cost contracts: an ana…Relationship Based Procurement Strategies for the 21st Century (2000)Relationship Based Procuremen…Basic Content Analysis (1990)Basic Content AnalysisThe Pricing of Options and Corporate Liabilities (1973)Theory of Rational Option Pricing (1973)Theory of rational option pricing (2005)Achieving better performance through target cost contracts (2010)Identifying the critical success factors for target cost contracts in the construction industry (2010)Incentive contract design for projects: The owner׳s perspective (2015)Project alliancing vs project partnering: a case study of the Australian National Museum Project (2002)The definition of partnering as a Wittgenstein family‐resemblance concept (2005)Assessment framework for construction supply chain relationships: Development and evaluation (2010)Defining relational contracting from the Wittgenstein family-resemblance philosophy (2011)Construction Management: New Directions (2012)COLLABORATIVE PROJECT DELIVERY METHODS: A SCOPING REVIEW (2020)Integrating OHS, EMS and QM with constructability principles when construction planning – a design and construct project case study (2001)Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction (2010)Using Social Interaction Theory to Promote Successful Relational Contracting between Clients and Contractors in Construction (2014)Qualitative content analysis in nursing research: concepts, procedures and measures to achieve trustworthiness (2003)Three Approaches to Qualitative Content Analysis (2005)The qualitative content analysis process (2008)Conceptualizing a two‐stage target‐cost arrangement for competitive cooperation (2010)Collaborative incentive contracts: stimulating competitive behaviour without competition (2014)Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects (2021)Deconstructing partnering in project-based organisation: Seven pillars, seven paradoxes and seven deadly sins (2007)Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study (2007)Exploring performance of the integrated project delivery process on complex building projects (2016)Evaluating the general conditions of a construction contract (1994)Incentive/disincentive contracts and its effects on industrial projects (2002)Construction project change management in Singapore: Status, importance and impact (2012)Das theoriegenerierende Experteninterview (2002)Is low self-esteem an inevitable consequence of stigma? An example from women with chronic mental health problems (2002)Constraints and facilitators for senior tourism (2018)
this work references cited by second hop

References

  • 1990Basic Content Analysis7,746 cited
  • 2000The Research Interview681 cited
  • 2003An empirical study of the benefits of construction partnering in Hong Kong198 cited
  • 2018Construction Contracting124 cited
  • 2006The definition of alliancing in construction as a Wittgenstein family-resemblance concept111 cited
  • 2000Target cost contracts: an analysis of the interplay between fee, target, share and price49 cited
  • 2000Relationship Based Procurement Strategies for the 21st Century48 cited
  • 2001The guaranteed maximum price contract as call option37 cited