SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Minimum average fraction inspected for short-run CSP-1 plan
6 references·0 citing·22 second hop
Minimum average fraction inspected for short-run CSP-1 plan (1998)Minimum average fraction inspected for sh…Journal of Industrial Engineering (2017)Journal of Industrial Enginee…Probability Limits on Outgoing Quality for Continuous Sampling Plans (1991)Probability Limits on Outgoin…A Renewal-Process Approach to Continuous Sampling Plans (1983)A Renewal-Process Approach to…The Effect of Short Production Runs on CSP-1 (1977)The Effect of Short Productio…Additional Continuous Sampling Inspection Plans (1977)Additional Continuous Samplin…A Sampling Inspection Plan for Continuous Production (1943)A Sampling Inspection Plan fo…A Note on Dodge's Continuous Inspection Plan (1953)Multi-Level Continuous Sampling Plans (1955)Effects of correlation on fraction non-conforming statistical process control procedures (1998)A continuous sampling plan using CUSUMs (2002)A continuous sampling plan using sums of conforming run‐lengths (2003)Industrial Quality Control. (1946)Sampling Inspection and Quality Control (1977)Average outgoing quality of CSP-C continuous sampling plan under short run production processes (2006)Optimal CSP-1 boundary scheme based on the estimator of the proportion of conformance for specified in-control process (2018)New Criteria for Selecting Continuous Sampling Plans (1964)A Tightened m-Level Continuous Sampling Plan for Markov-Dependent Production Processes (1984)Expected Cost for Continuous Sampling Plans (2011)An EOQ Model for Items with Weibull Distribution Deterioration (1973)Marketing's Interaction with Other Functional Units: A Conceptual Framework and Empirical Evidence (1987)Revised NIOSH equation for the design and evaluation of manual lifting tasks (1993)A comparison of forecasting methods for hotel revenue management (2003)Evaluation of forecasting error measurements and techniques for intermittent demand (2010)Examination of demand forecasting by time series analysis for auto parts remanufacturing (2015)Optimal one-sided shewhart control charts with variable sampling intervals (1989)Cost of quality: Evaluating cost-quality trade-offs for inspection strategies of manufacturing processes (2017)A New System of Skip-Lot Sampling Plans including Resampling (2014)Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system (2016)
this work references cited by second hop

References

  • 2017Journal of Industrial Engineering1,639 cited
  • 1943A Sampling Inspection Plan for Continuous Production281 cited
  • 1977Additional Continuous Sampling Inspection Plans64 cited
  • 1983A Renewal-Process Approach to Continuous Sampling Plans30 cited
  • 1991Probability Limits on Outgoing Quality for Continuous Sampling Plans24 cited
  • 1977The Effect of Short Production Runs on CSP-116 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work