Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability
16 references·0 citing·26 second hop
Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability (2005)Chance-Constrained Time–Cost Tradeoff Ana…Linear Programming Under Uncertainty (2004)Linear Programming Under Unce…A GA-based fuzzy optimal model for construction time–cost trade-off (2001)A GA-based fuzzy optimal mode…Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Optimization of construction …GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Using Improved Genetic Algori…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Stochastic Programming (1995)Stochastic ProgrammingConstruction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)Construction Time-Cost Trade-…Precedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…A Simple CPM Time-Cost Tradeoff Algorithm (1971)A Simple CPM Time-Cost Tradeo…Probability, statistics, and decision for civil engineers (1970)Probability, statistics, and …Project management with CPM and PERT (1965)Project management with CPM a…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Chance-Constrained Programming (1959)Chance-Constrained ProgrammingLinear Programming under Uncertainty (1955)Linear Programming under Unce…Multiple Attribute Decision Making (1981)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)An integrated survey of deterministic project scheduling (2001)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)An investigation into the fundamentals of critical chain project scheduling (2001)Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints (1963)Optimization under uncertainty: state-of-the-art and opportunities (2003)Stochastic Programming (2010)The discrete time-cost tradeoff problem revisited (1995)Project management with time, cost, and quality considerations (1996)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Narrow Reliability Bounds for Structural Systems (1979)Reliability-based optimization in structural engineering (1994)Stochastic Dynamics of Marine Structures (2012)A two-stage stochastic programming framework for transportation planning in disaster response (2004)Adjustable robust solutions of uncertain linear programs (2004)Lectures on Stochastic Programming: Modeling and Theory (2009)Monte Carlo bounding techniques for determining solution quality in stochastic programs (1999)
this work references cited by second hop

References

  • 1959Chance-Constrained Programming2,748 cited
  • 1970Probability, statistics, and decision for civil engineers1,880 cited
  • 1995Stochastic Programming1,539 cited
  • 1955Linear Programming under Uncertainty1,227 cited
  • 2004Linear Programming Under Uncertainty1,173 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 1965Project management with CPM and PERT305 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1999Optimization of construction time-cost trade-off analysis using genetic algorithms229 cited
  • 1971A Simple CPM Time-Cost Tradeoff Algorithm223 cited
  • 1997Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization209 cited
  • 2001A GA-based fuzzy optimal model for construction time–cost trade-off182 cited
  • 1995Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method171 cited
  • 1980Precedence and Arrow Networking Techniques for Construction

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

167 cited

Cited by

No citing works inside the corpus for this window.