SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Critical path analysis and resource constrained project scheduling — Theory and practice
9 references·8 citing·33 second hop
Critical path analysis and resource constrained project scheduling — Theory and practice (1985)Critical path analysis and resource const…Why Projects Are “Always” Late: A Rationale Based on Manual Simulation of a PERT/CPM Network (1981)Why Projects Are “Always” Lat…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)An Algorithm for Optimal Proj…Network analysis for planning and scheduling (1970)Network analysis for planning…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …Management Guide to PERT/CPM (1969)Management Guide to PERT/CPMA Heuristic Model for Scheduling Large Projects with Limited Resources (1967)A Heuristic Model for Schedul…Project management with CPM and PERT (1965)Project management with CPM a…A learning-based optimization approach to multi-project scheduling (2014)A learning-based optimization…Schedule Analysis under the Effect of Resource Allocation (2007)Schedule Analysis under the E…Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment (2004)Identification and illuminati…Phantom Float (2003)Phantom FloatAdaptive resource allocation in multimodal activity networks (2003)Adaptive resource allocation …Application of Petri Nets and a Genetic Algorithm to Multi-Mode Multi-Resource Constrained Project Scheduling (2001)Application of Petri Nets and…Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (1993)Early-tardy cost trade-offs i…Resource-Constrained Scheduling of Projects with Variable-Intensity Activities (1990)Resource-Constrained Scheduli…Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Heuristics for scheduling projects with resource restrictions and several resource-duration modes (1993)An exact algorithm for project scheduling with multiple modes (1997)An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling (2006)Production scheduling with alternative process plans (2011)A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems (2017)Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Resource-constrained project scheduling by simulated annealing (1996)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Journal of Industrial Engineering (2017)A Heuristic Program for Locating Warehouses (1976)Project scheduling: The effects of problem structure on heuristic performance (1976)Scheduling of Project Networks by Job Assignment (1991)Advances in Critical Path Methods (1966)Project Network Summary Measures Constrained- Resource Scheduling (1975)The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong (1995)Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)An investigation into the fundamentals of critical chain project scheduling (2001)Project management with time, cost, and quality considerations (1996)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Parkinson's Law and Its Implications for Project Management (1991)Using activity sensitivity and network topology information to monitor project time performance (2009)Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation (2011)AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS (1989)Project Scheduling Problems: A Survey (1993)A genetic algorithm for resource-constrained scheduling (1996)Project scheduling with resource constraints: A branch and bound approach (1987)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)
this work references cited by second hop

References

  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1965Project management with CPM and PERT305 cited
  • 1969Management Guide to PERT/CPM304 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 1971An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints165 cited
  • 1967A Heuristic Model for Scheduling Large Projects with Limited Resources164 cited
  • 1981Why Projects Are “Always” Late: A Rationale Based on Manual Simulation of a PERT/CPM Network119 cited
  • 1970Network analysis for planning and scheduling108 cited

Cited by

  • 2001Application of Petri Nets and a Genetic Algorithm to Multi-Mode Multi-Resource Constrained Project Scheduling65 cited
  • 2003Adaptive resource allocation in multimodal activity networks56 cited
  • 1993Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach53 cited
  • 1990Resource-Constrained Scheduling of Projects with Variable-Intensity Activities49 cited
  • 2004Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

48 cited
  • 2007Schedule Analysis under the Effect of Resource Allocation48 cited
  • 2014A learning-based optimization approach to multi-project scheduling42 cited
  • 2003Phantom Float38 cited