SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimal two-stage lot sizing and inventory batching policies
7 references·11 citing·45 second hop
Optimal two-stage lot sizing and inventory batching policies (1999)Optimal two-stage lot sizing and inventor…Note—On the Optimality of Integer Lot Size Ratios in “Economic Lot Size Determination in Multi-Stage Assembly Systems” (1982)Note—On the Optimality of Int…Production planning: a review (1981)Production planning: a reviewOptimizing multi-stage production with constant lot size and varying numbers of batches (1980)Optimizing multi-stage produc…Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems (1975)Optimal and System Myopic Pol…Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model (1975)Manufacturing Cycle Time Dete…Economic Lot Size Determination in Multi-Stage Assembly Systems (1973)Economic Lot Size Determinati…The Economic Lot Sizes in Multistage Production Systems (1970)The Economic Lot Sizes in Mul…Inventory system with defective products and investment opportunity for reducing defective proportion (2016)Inventory system with defecti…Modified economic production and raw material model with quality loss for conforming product (2015)Modified economic production …EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment (2013)EPQ model with learning consi…Retracted: Using genetic algorithm approach to solve a multi-product EPQ model with defective items, rework, and constrained space (2012)Retracted: Using genetic algo…An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate (2012)An economic manufacturing qua…Optimal production schedule in declining market for an imperfect production system (2010)Optimal production schedule i…Optimal production run time for two-stage production system with imperfect processes and allowable shortages (2010)Optimal production run time f…A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework, and constrained space (2009)A parameter-tuned genetic alg…Effect of inspection errors and preventive maintenance on a two-stage production inventory system (2006)Effect of inspection errors a…Optimal production run length and capital investment in quality improvement with an imperfect production process (2004)Optimal production run length…A sensitivity analysis of an integrated model for joint determination of economic design of $\overline{x}$‐control charts, economic production quantity and production run length for a deteriorating production system (2002)A sensitivity analysis of an …A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach (1969)Improved Heuristics for Multi-Stage Requirements Planning Systems (1982)A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System (1986)Models for multi-plant coordination (1993)Optimal Policies for a Multi-Echelon Inventory Problem (2004)Including sustainability criteria into inventory models (2012)Dynamic Version of the Economic Lot Size Model (1958)Decision Systems for Inventory Management and Production Planning (1979)Lead time management (1983)Integrating marketing and production planning in make-to-order companies (1993)Dynamic Version of the Economic Lot Size Model (2004)Investigating implementation issues for workload control (WLC): A comparative case study analysis (2007)Analysis of Inventory Systems. (1964)Economic batch quantity in a multi-stage production system (1978)Multi-stage production-inventory systems (1990)The economic lot and delivery scheduling problem: models for nested schedules (1995)Economic Production Cycles with Imperfect Production Processes (1986)Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction (1986)A generalized model for the economic design of ??control charts for production systems with increasing failure rate and early replacement (1993)Optimal production run time and inspection errors in an imperfect production system with warranty (2017)An Imperfect Production–Inventory Model with Mixed Materials Containing Scrap Returns Based on a Circular Economy (2021)Factors Affecting the Cost of Airplanes (1936)Ranking fuzzy numbers based on decomposition principle and signed distance (2000)Lost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production system (2016)Optimal decision of an economic production quantity model for imperfect manufacturing under hybrid maintenance policy with shortages and partial backlogging (2018)An EPQ model for three-layer supply chain with partial backordering and disruption: Triangular dense fuzzy lock set approach (2019)Optimal Inventory Policy (1951)Determination of Optimum Production Quantity for a Two-Stage Production System (1977)Analysis of Multistage Production Systems (1988)A bargaining model with asymmetric information for a single supplier–single buyer problem (2004)Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems (1969)Optimal Policy for a Two-Stage Assembly System under Random Demand (1985)The Joint Replenishment Problem with a Powers-of-Two Restriction (1985)Chapter 12 Stochastic inventory theory (1990)A Hybrid Algorithm for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures (1983)Modelling production opportunities — an historical overview (1995)Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality (1994)Optimal manufacturing batch size with rework process at a single-stage production system (2004)Economic production quantity with rework process at a single-stage manufacturing system with planned backorders (2009)An EPQ model for deteriorating items with variable production cost, time dependent holding cost and partial backlogging under inflation (2013)EOQ model for imperfect quality items with partial backorders and screening constraint (2015)Cost-effective smart autonomation policy for a hybrid manufacturing-remanufacturing (2021)Integrating production and quality control policies: A survey (1993)Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information (2008)Managing yield by lot splitting in a serial production line with learning, rework and scrap (2009)
this work references cited by second hop

References

  • 1973Economic Lot Size Determination in Multi-Stage Assembly Systems210 cited
  • 1975Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems191 cited
  • 1975Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model145 cited
  • 1981Production planning: a review108 cited
  • 1970The Economic Lot Sizes in Multistage Production Systems64 cited
  • 1982Note—On the Optimality of Integer Lot Size Ratios in “Economic Lot Size Determination in Multi-Stage Assembly Systems”53 cited
  • 1980Optimizing multi-stage production with constant lot size and varying numbers of batches46 cited

Cited by

  • 2012An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate34 cited
  • 2006Effect of inspection errors and preventive maintenance on a two-stage production inventory system31 cited
  • 2013EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment29 cited
  • 2009A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework, and constrained space27 cited
  • 2010Optimal production run time for two-stage production system with imperfect processes and allowable shortages18 cited
  • 2012Retracted: Using genetic algorithm approach to solve a multi-product EPQ model with defective items, rework, and constrained space

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

17 cited
  • 2004Optimal production run length and capital investment in quality improvement with an imperfect production process15 cited
  • 2010Optimal production schedule in declining market for an imperfect production system15 cited
  • 2016Inventory system with defective products and investment opportunity for reducing defective proportion15 cited
  • 2015Modified economic production and raw material model with quality loss for conforming product14 cited
  • 2002A sensitivity analysis of an integrated model for joint determination of economic design of $\overline{x}$‐control charts, economic production quantity and production run length for a deteriorating production system11 cited