SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Tower Crane Cycle Times: Case Study of Remote-Control versus Cab-Control Operation
6 references·0 citing·23 second hop
Tower Crane Cycle Times: Case Study of Remote-Control versus Cab-Control Operation (2014)Tower Crane Cycle Times: Case Study of Re…Nonlinear Models for Predicting Hoisting Times of Tower Cranes (2002)Nonlinear Models for Predicti…Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes (2001)Comparative study of artifici…Prediction of hoisting time for tower cranes for public housing construction in Hong Kong (1999)Prediction of hoisting time f…Location Optimization for a Group of Tower Cranes (1999)Location Optimization for a G…Introduction to work study (1992)Introduction to work studySingle Crane Location Optimization (1983)Single Crane Location Optimiz…Construction Labor Productivity Modeling with Neural Networks (1998)Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)Regularization Neural Network for Construction Cost Estimation (1998)Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes (2008)Vision System for Tower Cranes (2008)Artificial Neural Networks for Construction Management: A Review (2017)Factors Affecting Masonry‐Labor Productivity (1991)Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)Forecasting technique familiarity, satisfaction, usage, and application (1995)Crane overlap and operational flexibility: balancing utilization, duration, and safety (2017)Survey of quantitative methods in construction (2017)Optimum Locations of Switching Centers and the Absolute Centers and Medians of a Graph (1964)State of the Art—Location on Networks: A Survey. Part I: The p-Center and p-Median Problems (1983)State of the Art—Location on Networks: A Survey. Part II: Exploiting Tree Network Structure (1983)Spatio-temporal planning for tower cranes in construction projects with simulated annealing (2019)Forecasting in business and economics (1990)A study of the factors affecting construction durations in Hong Kong (1995)Tower crane safety in the construction industry: A Hong Kong study (2010)AHP-Based Equipment Selection Model for Construction Projects (2005)Modeling Tower Crane Operator Visibility to Minimize the Risk of Limited Situational Awareness (2012)A framework for real-time pro-active safety assistance for mobile crane lifting operations (2016)Rules for integrating fast changeover capabilities into new equipment design (2002)The Operational and Signaling Benefits of Voluntary Labor Code Adoption: Reconceptualizing the Scope of Human Resource Management in Emerging Economies (2015)
this work references cited by second hop

References

  • 1992Introduction to work study251 cited
  • 1999Location Optimization for a Group of Tower Cranes164 cited
  • 1983Single Crane Location Optimization57 cited
  • 2001Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes54 cited
  • 2002Nonlinear Models for Predicting Hoisting Times of Tower Cranes44 cited
  • 1999Prediction of hoisting time for tower cranes for public housing construction in Hong Kong43 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work