this work references cited by second hopReferences
- 1982Out of the Crisis7,278 cited
- 1988The House of Quality2,266 cited
- 1961Total quality control1,547 cited
- 1992Production and Operations Analysis1,213 cited
- 1986Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction1,161 cited
- 1990The deming management method1,052 cited
- 1986Economic Production Cycles with Imperfect Production Processes1,049 cited
- 1967Quality Control and Industrial Statistics.1,001 cited
- 1995Lot Sizing with Random Yields: A Review941 cited
- 1986World class manufacturing : the lessons of simplicity applied884 cited
- 1983Japanese manufacturing techniques782 cited
- 1987Kanban, MRP, and Shaping the Manufacturing Environment387 cited
- 1985The Uneasy alliance: Managing the productivity-technology dilemma343 cited
- 1981Operations Research in Inventory Management: A Review and Critique326 cited
- 1991An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes287 cited
- 1990Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield
Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work