SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Identification and evaluation of processes in a construction enterprise
10 references·0 citing·49 second hop
Identification and evaluation of processes in a construction enterprise (2014)Identification and evaluation of processe…Time–cost relationship for predicting construction duration (2013)Time–cost relationship for pr…Risk Management of Construction Works by Means of the Utility Theory: A Case Study (2013)Risk Management of Constructi…OVERHEAD COSTS AND PROFIT CALCULATION BY POLISH CONTRACTORS (2013)OVERHEAD COSTS AND PROFIT CAL…HYBRID FLEXIBLE APPROACH FOR SIX SIGMA IMPLEMENTATION IN CONSTRUCTIONAL SME (2013)HYBRID FLEXIBLE APPROACH FOR …MULTIPLE CRITERIA DECISION SUPPORT SYSTEM FOR ASSESSMENT OF PROJECTS MANAGERS IN CONSTRUCTION (2012)MULTIPLE CRITERIA DECISION SU…Interaction Effects of Information Technologies and Best Practices on Construction Project Performance (2012)Interaction Effects of Inform…Construction network-based interface management system (2012)Construction network-based in…Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators (2011)Proposed System for Measuring…A fuzzy sets based contractor prequalification procedure (2011)A fuzzy sets based contractor…Implementing Total Quality Management in Construction Firms (2003)Implementing Total Quality Ma…Firm Resources and Sustained Competitive Advantage (1991)Dynamic capabilities and strategic management (1997)Firm resources and sustained competitive advantage (2004)Critical Success Factors for Commissioning and Start-Up of Capital Projects (2016)Application of the AHP in project management (2001)A NEW ADDITIVE RATIO ASSESSMENT (ARAS) METHOD IN MULTICRITERIA DECISION‐MAKING / NAUJAS ADITYVINIS KRITERIJŲ SANTYKIŲ ĮVERTINIMO METODAS (ARAS) DAUGIAKRITERINIAMS UŽDAVINIAMS SPRĘSTI (2010)MULTIPLE CRITERIA DECISION MAKING (MCDM) METHODS IN ECONOMICS: AN OVERVIEW / DAUGIATIKSLIAI SPRENDIMŲ PRIĖMIMO METODAI EKONOMIKOJE: APŽVALGA (2011)A fuzzy multiple-criteria decision-making model for contractor prequalification (2015)Impact of Competition on Prices in Public Sector Procurement (2015)A type-2 fuzzy set model for contractor prequalification (2017)Managing high-technology programs and projects (1976)Project management in construction (1985)Project management — A managerial approach (1989)How to Improve Interface Management Behaviors in EPC Projects: Roles of Formal Practices and Social Norms (2018)Managing Interfaces in Large-Scale Projects: The Roles of Formal Governance and Partnering (2021)Quality Is Free: The Art of Making Quality Certain (1979)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)The Six Sigma Way: How GE, Motorola, and Other Top Companies are Honing Their Performance (2000)The Utility Analysis of Choices Involving Risk (1948)Prospect Theory: An Analysis of Decision under Risk (1979)Prospect theory: An analysis of decision under risk (1988)Barriers in Running Construction SME – Case Study on Introduction of Agile Methodology to Electrical Subcontractor (2015)Exploring Large Language Model AI tools in Construction Project Risk Assessment: Chat GPT Limitations in Risk Identification, Mitigation Strategies, and User Experience (2025)A Competitive-Bidding Strategy (1956)A Fuzzy Decision Framework for Contractor Selection (2004)MULTI‐OBJECTIVE CONTRACTOR'S RANKING BY APPLYING THE MOORA METHOD (2008)Evaluation of Planned Construction Projects Using Fuzzy Logic (2017)Project management: A systems approach to planning, scheduling and controlling (1982)Project management : a systems approach to planning, scheduling, and controlling (1995)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Construction costs forecasting: comparison of the accuracy of linear regression and support vector machine models (2017)Total quality management: practice and outcomes in the largest US firms (1995)Total Quality Management: Text with Cases (1995)Critical factors and performance measures of TQM (2001)Implementing integration of ISO 9001 and ISO 14001 for construction (2005)Organizational culture and TQM implementation in construction firms in Singapore (2008)The impact of incentive mechanisms on project performance (2011)Rank Correlation Methods. (1957)The analytic hierarchy process : planning, priority setting, resource allocation (1980)Multiple Attribute Decision Making (1981)Decision making in machine tool selection: An integrated approach with SWARA and COPRAS-G methods (2013)Causes of Conflicts in a Construction Industry: A Communicational Approach (2014)The Recalculation of the Weights of Criteria in MCDM Methods Using the Bayes Approach (2018)Designing performance measures: a structured approach (1997)The balanced scorecard: Translating strategy into action (1997)Key performance indicators for measuring construction success (2004)Praxis of Performance Measurement in Public-Private Partnerships: Moving beyond the Iron Triangle (2016)Best Value Contractor Selection in Road Construction Projects: ANP-Based Decision Support System (2017)From design to operations: a process management life-cycle performance measurement system for Public-Private Partnerships (2017)
this work references cited by second hop

References

  • 2003Implementing Total Quality Management in Construction Firms207 cited
  • 2012MULTIPLE CRITERIA DECISION SUPPORT SYSTEM FOR ASSESSMENT OF PROJECTS MANAGERS IN CONSTRUCTION150 cited
  • 2011Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators77 cited
  • 2011A fuzzy sets based contractor prequalification procedure51 cited
  • 2013Risk Management of Construction Works by Means of the Utility Theory: A Case Study41 cited
  • 2012Construction network-based interface management system40 cited
  • 2013Time–cost relationship for predicting construction duration38 cited
  • 2013OVERHEAD COSTS AND PROFIT CALCULATION BY POLISH CONTRACTORS37 cited
  • 2012Interaction Effects of Information Technologies and Best Practices on Construction Project Performance34 cited
  • 2013HYBRID FLEXIBLE APPROACH FOR SIX SIGMA IMPLEMENTATION IN CONSTRUCTIONAL SME13 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work